AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

LUCKNOW: Rescue teams were unable on Wednesday to reach 40 workers trapped in a collapsed highway tunnel in India, as huge boulders were blocking efforts to create an evacuation passage, officials said.

It has been three days since the tunnel collapsed but the labourers continue to be safe and healthy, one official involved in the rescue operations told Reuters.

The trapped men have been given food, water and oxygen through a pipe since Sunday morning, after the tunnel caved in at 5:30 a.m. (0000 GMT).

“A heavy machine is being brought in from New Delhi to insert an evacuation pipe as the current one is being blocked by boulders,” G.S. Naveen, relief commissioner of Uttar Pradesh state, told Reuters.

There were about 50-60 men working on the night shift in the 4.5-km (3-mile) tunnel, which is being built in neighbouring Uttarakhand state on a national highway that is part of the Char Dham Hindu pilgrimage route.

Local media reported on Tuesday that those near the exit of the tunnel got out, while the 40 who were deeper inside were trapped.

The Char Dham highway is one of the most ambitious projects of Prime Minister Narendra Modi’s Hindu nationalist government.

It aims to connect four pilgrimage sites revered by Hindus in Uttarakhand through 890 km (550 miles) of roads being built at a cost of $1.5 billion.

The mountainous region is prone to landslides, earthquakes and floods and the incident follows events of land subsidence that geologists, residents and officials have blamed on rapid construction in the mountains.

Heavy machinery brought in to pull out Indian workers from collapsed tunnel

The project has faced criticism from environmental experts and some work had been halted after hundreds of houses were damaged by subsidence along the routes.

The work on the tunnel commenced in 2018 and was intended to be completed by July 2022, which has now been delayed to May 2024, a government statement said.

Comments

200 characters