AIRLINK 74.24 Decreased By ▼ -0.32 (-0.43%)
BOP 5.05 Decreased By ▼ -0.01 (-0.2%)
CNERGY 4.45 Decreased By ▼ -0.01 (-0.22%)
DFML 41.35 Increased By ▲ 1.62 (4.08%)
DGKC 87.10 Decreased By ▼ -0.45 (-0.51%)
FCCL 21.83 Decreased By ▼ -0.10 (-0.46%)
FFBL 34.21 Decreased By ▼ -0.38 (-1.1%)
FFL 9.95 Increased By ▲ 0.20 (2.05%)
GGL 10.52 Increased By ▲ 0.03 (0.29%)
HBL 113.54 Decreased By ▼ -0.25 (-0.22%)
HUBC 136.02 Decreased By ▼ -0.50 (-0.37%)
HUMNL 11.90 Increased By ▲ 1.00 (9.17%)
KEL 4.83 Increased By ▲ 0.16 (3.43%)
KOSM 4.57 Decreased By ▼ -0.07 (-1.51%)
MLCF 38.25 Decreased By ▼ -0.21 (-0.55%)
OGDC 135.76 Decreased By ▼ -0.38 (-0.28%)
PAEL 26.73 Increased By ▲ 0.12 (0.45%)
PIAA 20.80 Decreased By ▼ -1.69 (-7.51%)
PIBTL 6.72 Increased By ▲ 0.05 (0.75%)
PPL 122.75 Increased By ▲ 0.46 (0.38%)
PRL 26.90 Decreased By ▼ -0.07 (-0.26%)
PTC 14.45 Increased By ▲ 0.54 (3.88%)
SEARL 59.65 Decreased By ▼ -0.22 (-0.37%)
SNGP 70.13 Increased By ▲ 0.07 (0.1%)
SSGC 10.34 Decreased By ▼ -0.01 (-0.1%)
TELE 8.57 Increased By ▲ 0.03 (0.35%)
TPLP 11.25 Decreased By ▼ -0.09 (-0.79%)
TRG 65.25 Decreased By ▼ -0.75 (-1.14%)
UNITY 26.25 Decreased By ▼ -0.08 (-0.3%)
WTL 1.34 Decreased By ▼ -0.01 (-0.74%)
BR100 7,853 Increased By 28.9 (0.37%)
BR30 25,399 Decreased By -6.7 (-0.03%)
KSE100 75,239 Increased By 154.7 (0.21%)
KSE30 24,165 Increased By 71.5 (0.3%)

Prime Minister Shehbaz Sharif on Wednesday said the Federal Government would not leave the flood-affected people of Sindh in distress and would continue to take measures to mitigate their sufferings, APP reported.

The prime minister, during his visit to Pir Guddu and Kot Diji towns of the flood-affected Khairpur district, inspected the post-flood rehabilitation work.

PM Shehbaz, in his address to the flood victims, said the people of Sindh suffered from loss of life and property as the floods had wreaked havoc in the province. The Federal Government, he added, provided the utmost resources to the provincial government to overcome the massive problem.

Under the Benazir Income Support Programme, the Federal Government disbursed Rs70 billion to the flood victims, he added. Serving the masses and their welfare was the priority of the government, the prime minister said.

Shehbaz Sharif said the rehabilitation and reconstruction work had been completed to a large extent, however, stressed that the de-watering of the inundated areas of Dadu required immediate attention.

Flood relief: ADB approves $554mn financing package

He said in the wake of floods, some 20 million people, including nine million children, were in dire need of assistance from the government, and it required billions of rupees to address the challenges of food and medicine.

PM Shehbaz mentioned that Pakistan was facing the brunt of climate change despite minimal contribution to global carbon emissions.

He lauded the overseas Pakistanis for contributing Rs 2.75 billion donations to the Prime Minister’s Flood Relief Fund, which, he said, would be spent transparently for the welfare of flood-hit people.

He assured the flood-struck people that the government would construct houses for their proper accommodation. He also announced the establishment of a campus of COMSATS University in Khairpur.

The prime minister also met the flood-affected people at makeshift camps and inquired about the availability of facilities being provided to them by the government.

Sindh Governor Kamran Khan Tissori said the coordination between federal and provincial governments was important in providing facilities to the flood-affected people who were facing the challenges of food security and accommodation.

Flood relief activities: ‘Pakistan has received $738.53m foreign aid so far’

Sindh Chief Minister Syed Murad Ali Shah mentioned the need for the availability of funds for redefining and clearing the natural water courses so as to minimize the chances of floods. He also sought the Federal Government’s assistance to help the province rectify its drainage system.

Prime Minister Shehbaz was given a briefing on the ongoing rehabilitation and reconstruction projects being carried out in the flood-affected areas. It was highlighted that the areas be restored in line with the feasibility study following a rainfall of 2011-12 that outlined the natural water courses.

It was emphasized that most of the flood-hit areas had been de-watered, with electricity fully restored.

Planning Minister Ahsan Iqbal, Information Minister Marriyum Aurangzeb, Climate Change Minister Sherry Rehman, National Disaster Management Authority Chairman Lt Gen Inam Haider Malik and senior officials of the provincial government were present.

Comments

Comments are closed.