AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

LAHORE: The mega water reservoir of Tarbela has filled to its maximum level of 1550 feet above mean sea level, resulting in 5.827 million acre-feet (MAF) of water in the dam, which is a good omen for agriculture and hydel power generation in Pakistan in the days to come, said the data released by Water and Power Development Authority (WAPDA).

It said Tarbela Dam is considered to be an iconic project for the contribution it has been making towards the development of Pakistan since 1974 by releasing the stored water for agriculture, mitigating floods, and providing low-cost hydel electricity to the national grid.

Tarbela reservoir has a live water storage capacity of 5.826 MAF. Besides, Tarbela is the biggest electricity generation facility in Pakistan with an installed capacity of 4888 megawatts (MW), which will further increase to 6418 MW after the completion of the Tarbela 5th Extension Hydropower Project.

As per the hydrological data, the river inflows, outflows, and the reservoir level at Tarbela, Mangla, and Chashma along with the water situation at the barrages is up to the optimum level.

According to the data, water inflows of Kabul at Nowshera is 69400 cusecs with outflows of 69400 cusecs, followed by inflows of Jhelum at Mangla 26700 cusecs and outflows of 10000 cusecs, inflows of Chenab at Marala 76100 cusecs and outflows 54300 cusecs.

So far as barrages are concerned, Jinnah inflows 276000 cusecs and outflows 271500 cusecs, Chashma inflows 386000 cusecs and outflows 386000 cusecs, Taunsa inflows 437700 cusecs and outflows 437700 cusecs, Guddu inflows 361800 cusecs and outflows 361800 cusecs Sukkur inflows 351100 cusecs and outflows 351100 cusecs.

Copyright Business Recorder, 2022

Comments

Comments are closed.