AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

ISLAMABAD: Water and Power Development Authority (Wapda) has expressed its concern on generation loss at Warsak power station due to frequent trippings during peak load at NTDC system.

In a letter to Secretary Ministry of Water Resources, Member Power (Wapda) stated that four 132 kV transmission lines are emanating from Warsak power station for power dispersal to National Grid.

Two Lines (L1 & L2) are connected with the system through Shahi Bagh Grid while the remaining two lines (L3 & L4) are connected with GSS Peshawar Cantt and GSS Jamrud.

A peak load of 233 MW was dispersed through these four transmission lines in Financial Year 2020-21. Member Power claimed that peak load is frequently interrupted by total tripping of plant due to instability of grid system and with this any 132 KV transmission line (L1 & L2) or both the remaining two lines (L3 & L4) also trip, resulting in total tripping of the plant.

Recovery of dues from CPPA-G: Wapda seeks help of Power Division

“This tripping subject the generating units to extreme values of speed, voltage and frequency which are detriment to operational performance and safety of generating units”, he maintained.

Wapda maintained that sudden load rejection of the fully loaded machines may cause serious mishaps to the machines. Excessive wear and tear of the supporting bearings and other allied parts of the machine, civil structure deformation and misalignment of machines may happen due to abnormal vibrations caused by sudden load rejection.

Copyright Business Recorder, 2022

Comments

Comments are closed.