BR100 Increased By (0.86%)
BR30 Increased By (0.98%)
KSE100 Increased By (0.9%)
KSE30 Increased By (1%)
BECO 5.44 Increased By ▲ 0.05 (0.93%)
BML 57.85 Increased By ▲ 0.39 (0.68%)
BOP 36.62 Increased By ▲ 0.31 (0.85%)
CNERGY 8.20 Decreased By ▼ -0.01 (-0.12%)
DCL 12.16 Increased By ▲ 0.33 (2.79%)
FCCL 59.54 Increased By ▲ 0.26 (0.44%)
FCSC 5.03 Increased By ▲ 0.02 (0.4%)
FFL 17.88 Increased By ▲ 0.03 (0.17%)
FNEL 1.28 Increased By ▲ 0.02 (1.59%)
HUMNL 11.48 Decreased By ▼ -0.02 (-0.17%)
KEL 8.37 Increased By ▲ 0.04 (0.48%)
KOSM 6.62 Decreased By ▼ -0.01 (-0.15%)
MLCF 109.20 Increased By ▲ 1.77 (1.65%)
NBP 208.22 Increased By ▲ 3.21 (1.57%)
PACE 11.45 Increased By ▲ 0.35 (3.15%)
PAEL 45.72 Increased By ▲ 0.30 (0.66%)
PIAHCLA 31.24 Decreased By ▼ -0.52 (-1.64%)
PIBTL 19.11 Increased By ▲ 0.26 (1.38%)
PPL 245.20 Increased By ▲ 1.46 (0.6%)
PRL 36.31 Increased By ▲ 0.07 (0.19%)
PTC 73.37 Increased By ▲ 1.30 (1.8%)
SEARL 95.64 Increased By ▲ 1.06 (1.12%)
SSGC 31.92 Increased By ▲ 0.07 (0.22%)
TELE 9.19 Increased By ▲ 0.17 (1.88%)
THCCL 68.65 Increased By ▲ 0.18 (0.26%)
TPLP 11.54 Increased By ▲ 0.82 (7.65%)
TREET 26.24 Increased By ▲ 0.35 (1.35%)
TRG 65.53 Increased By ▲ 1.22 (1.9%)
WAVES 11.12 Increased By ▲ 0.21 (1.92%)
WTL 1.28 Decreased By ▼ -0.01 (-0.78%)
Business & Finance

PM calls for urgent power sector reforms

  • Power minister Khurram Dastgir is tasked with gigantic issues including load-shedding and circular debt
Published April 27, 2022 Updated April 27, 2022 11:38am

Prime Minister Shehbaz Sharif has directed the Ministry of Power to introduce reforms in the power sector on an urgent basis.

In a meeting with Khurram Dastgir in Islamabad on Wednesday, PM Sharif also said immediate steps must be taken to operationalize power plants that are still shut, reported Radio Pakistan.

The newly appointed power minister is an electrical engineer by profession and has been tasked with gigantic power sector issues including load-shedding and much-needed power sector reforms.

He faces a number of challenges which include payment of overdue amounts to Independent Power Producers, Nuclear Power Plants and power plants established under the China Pakistan Economic Corridor.

Another concern is reduction in circular debt, which is about to touch Rs 2.6 trillion. He will also need to try to phase out commitments made by his predecessor to the World Bank, IMF and Asian Development Bank regarding reduction in circular debt, increase in tariff, improvement in recovery and reduction in losses that remain unmet by the Power Division.

Dastgir tasked to deal with load-shedding, circular debt

Dastgir's meeting with the PM comes a day after the prime minister said load-shedding must end in the country by May 1.

The PM was informed that 20 out of 27 power plants which were non-operational for more than a year have now been made operational and that there is a power shortfall between 500 MW to 2,000 MW in the country. He was told that the main reason for load-shedding is a lack of securing timely supply of fuel by the previous government for running power plants.

PM says power load-shedding to end by May 1

Comments

Comments are closed for this article.