AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

ISLAMABAD: Water and Power Development Authority (WAPDA) has expedited construction work on 12 small and medium dams aimed at enhancing a clean energy generation, water availability and climate resilience across the country.

As per details given by the official sources, the dams were dual purpose projects as these were designed to store rain and floodwater along with hydropower generation in all the federating units of the country.

He added that the small and medium dam projects initiated in Balochistan included Winder Dam project that would produce 0.3 megawatts (MW) energy and water storage capacity of 0.036 Million acre-foot (MAF), Naulong Dam to produce 4.4 MW power and store 0.20 MAF water, Hingol Dam to generate 1 MW electricity and 1.41 MAF water storage, Garuk Dam to have 0.3 MW power production capacity and 0.05 MAF water storage and Pelar Dam to produce 0.3 MW energy and would conserve 0.099 MAF water.

In Sindh, the Nai Gaj Dam would produce 4.2 MW electricity and store 0.30 MAF water, whereas the Darawat Dam was expected to produce 0.45 MW energy and store 0.12 MAF water after completion.

The WAPDA has also started work on different small and medium dams in Khyber PukhtonKhawa including the Kurram Tangi Dam of 83.4 MW hydropower potential and 1.2 MAF water storage capacity, Tank Zam Dam having 25.5 MW power generation and 0.345 MAF water storage capacity and Daraban Zam Dam would produce 0.75 MW energy and 0.069 MAF water storage capacity.

The WAPDA official further said the Authority had started construction work on different small dams in Punjab including Ghabir Dam having 0.15 MW power production capacity and 0.066 MAF water storage, and Papin Dam of 0.3 MW power and 0.089 MAF water storage capacity hydropower projects that were at various stages of development.

He informed that keeping in view the energy demands, project completion pace and availability of funds the Authority has decided to ensure swift culmination of construction and development work on the projects as it would not only help address water and energy issues rather would generate jobs for the local communities and start tourism and business opportunities.

Comments

Comments are closed.