AIRLINK 80.50 Increased By ▲ 2.11 (2.69%)
BOP 5.30 Decreased By ▼ -0.04 (-0.75%)
CNERGY 4.42 Increased By ▲ 0.09 (2.08%)
DFML 33.19 Increased By ▲ 2.32 (7.52%)
DGKC 79.20 Increased By ▲ 0.69 (0.88%)
FCCL 20.60 Increased By ▲ 0.02 (0.1%)
FFBL 32.50 Increased By ▲ 0.20 (0.62%)
FFL 10.31 Increased By ▲ 0.09 (0.88%)
GGL 10.45 Increased By ▲ 0.16 (1.55%)
HBL 118.30 Decreased By ▼ -0.20 (-0.17%)
HUBC 135.64 Increased By ▲ 0.54 (0.4%)
HUMNL 6.80 Decreased By ▼ -0.07 (-1.02%)
KEL 4.56 Increased By ▲ 0.39 (9.35%)
KOSM 4.83 Increased By ▲ 0.10 (2.11%)
MLCF 38.62 Decreased By ▼ -0.05 (-0.13%)
OGDC 134.00 Decreased By ▼ -0.85 (-0.63%)
PAEL 23.83 Increased By ▲ 0.43 (1.84%)
PIAA 27.00 Increased By ▲ 0.36 (1.35%)
PIBTL 7.02 No Change ▼ 0.00 (0%)
PPL 113.20 Decreased By ▼ -0.25 (-0.22%)
PRL 28.03 Increased By ▲ 0.30 (1.08%)
PTC 14.97 Increased By ▲ 0.37 (2.53%)
SEARL 58.17 Increased By ▲ 1.67 (2.96%)
SNGP 67.50 Increased By ▲ 1.20 (1.81%)
SSGC 11.15 Increased By ▲ 0.21 (1.92%)
TELE 9.33 Increased By ▲ 0.18 (1.97%)
TPLP 11.78 Increased By ▲ 0.11 (0.94%)
TRG 72.80 Increased By ▲ 1.37 (1.92%)
UNITY 24.94 Increased By ▲ 0.43 (1.75%)
WTL 1.41 Increased By ▲ 0.08 (6.02%)
BR100 7,548 Increased By 55 (0.73%)
BR30 24,758 Increased By 200.2 (0.82%)
KSE100 72,496 Increased By 444.3 (0.62%)
KSE30 23,882 Increased By 74.1 (0.31%)

ISLAMABAD: Water and Power Development Authority (WAPDA) has expedited construction work on 12 small and medium dams aimed at enhancing a clean energy generation, water availability and climate resilience across the country.

As per details given by the official sources, the dams were dual purpose projects as these were designed to store rain and floodwater along with hydropower generation in all the federating units of the country.

He added that the small and medium dam projects initiated in Balochistan included Winder Dam project that would produce 0.3 megawatts (MW) energy and water storage capacity of 0.036 Million acre-foot (MAF), Naulong Dam to produce 4.4 MW power and store 0.20 MAF water, Hingol Dam to generate 1 MW electricity and 1.41 MAF water storage, Garuk Dam to have 0.3 MW power production capacity and 0.05 MAF water storage and Pelar Dam to produce 0.3 MW energy and would conserve 0.099 MAF water.

In Sindh, the Nai Gaj Dam would produce 4.2 MW electricity and store 0.30 MAF water, whereas the Darawat Dam was expected to produce 0.45 MW energy and store 0.12 MAF water after completion.

The WAPDA has also started work on different small and medium dams in Khyber PukhtonKhawa including the Kurram Tangi Dam of 83.4 MW hydropower potential and 1.2 MAF water storage capacity, Tank Zam Dam having 25.5 MW power generation and 0.345 MAF water storage capacity and Daraban Zam Dam would produce 0.75 MW energy and 0.069 MAF water storage capacity.

The WAPDA official further said the Authority had started construction work on different small dams in Punjab including Ghabir Dam having 0.15 MW power production capacity and 0.066 MAF water storage, and Papin Dam of 0.3 MW power and 0.089 MAF water storage capacity hydropower projects that were at various stages of development.

He informed that keeping in view the energy demands, project completion pace and availability of funds the Authority has decided to ensure swift culmination of construction and development work on the projects as it would not only help address water and energy issues rather would generate jobs for the local communities and start tourism and business opportunities.

Comments

Comments are closed.