AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

LAHORE: More than 700,000 smart water meters will be installed in the provincial capital within two years and the fees for the new meters will be collected from customers in 10 years.

This was disclosed in a Water and Sanitation Authority (Wasa) Lahore meeting which was chaired by its Managing Director Muhammad Tanveer here on Monday. DMD Engineering Mohammad Manan, Director Admin Mohammad Irfan, Director Zeeshan Bilal, Director Sohail Qadir, Director Sufyan Habib, Deputy Director Tayyab Malik and Samina Asif were present in the meeting.

The MD was further told that Lahore will be the first city of Pakistan to receive smart water metering; these meters will save water and bring investment to Pakistan.

Meanwhile, the Wasa Lahore MD visited the project site of Kashmir Road Underground Water Tank. On this occasion, the project site engineers told the MD that four walls of the underground water tank will be completed soon and added that after its completion rainwater will be stored during the next monsoon season. “After the tank becomes operational, rainwater will not inundate the Kashmir Road,” he added.

Copyright Business Recorder, 2022

Comments

Comments are closed.