AIRLINK 70.00 Decreased By ▼ -3.06 (-4.19%)
BOP 4.94 Decreased By ▼ -0.15 (-2.95%)
CNERGY 4.27 Decreased By ▼ -0.10 (-2.29%)
DFML 31.05 Decreased By ▼ -1.40 (-4.31%)
DGKC 76.50 Increased By ▲ 1.01 (1.34%)
FCCL 19.75 Increased By ▲ 0.23 (1.18%)
FFBL 34.50 Decreased By ▼ -1.65 (-4.56%)
FFL 9.14 Decreased By ▼ -0.08 (-0.87%)
GGL 9.82 Decreased By ▼ -0.03 (-0.3%)
HBL 113.00 Decreased By ▼ -3.70 (-3.17%)
HUBC 132.50 Decreased By ▼ -0.19 (-0.14%)
HUMNL 7.00 Decreased By ▼ -0.10 (-1.41%)
KEL 4.24 Decreased By ▼ -0.17 (-3.85%)
KOSM 4.32 Decreased By ▼ -0.08 (-1.82%)
MLCF 36.02 Decreased By ▼ -0.18 (-0.5%)
OGDC 132.75 Decreased By ▼ -0.75 (-0.56%)
PAEL 22.20 Decreased By ▼ -0.40 (-1.77%)
PIAA 24.35 Decreased By ▼ -1.66 (-6.38%)
PIBTL 6.50 Decreased By ▼ -0.05 (-0.76%)
PPL 117.30 Increased By ▲ 1.99 (1.73%)
PRL 25.83 Decreased By ▼ -0.80 (-3%)
PTC 13.50 Decreased By ▼ -0.60 (-4.26%)
SEARL 51.90 Decreased By ▼ -1.55 (-2.9%)
SNGP 68.11 Increased By ▲ 0.86 (1.28%)
SSGC 10.54 Decreased By ▼ -0.16 (-1.5%)
TELE 8.30 Decreased By ▼ -0.12 (-1.43%)
TPLP 10.73 Decreased By ▼ -0.02 (-0.19%)
TRG 59.88 Decreased By ▼ -3.99 (-6.25%)
UNITY 25.10 Decreased By ▼ -0.02 (-0.08%)
WTL 1.27 No Change ▼ 0.00 (0%)
BR100 7,404 Decreased By -56.9 (-0.76%)
BR30 23,960 Decreased By -211.8 (-0.88%)
KSE100 70,769 Decreased By -333.9 (-0.47%)
KSE30 23,291 Decreased By -103.8 (-0.44%)

KARACHI: Claiming that it was the Pakistan Muslim League-Nawaz (PML-N) government that had eliminated load-shedding from the country, senior PML-N leader and former prime minister Shahid Khaqan Abbasi said on Monday the Pakistan Tehreek-e-Insaf (PTI) government was yet to build a power plant in the country despite being in power for the last three and a half years.

Addressing a press conference in Karachi, the PML-N stalwart said three power plants were built under the last PML-N government: one at Hub, another at Port Qasim and the third one at Sahiwal.

“And work on the fourth one was in progress when the party’s government’s term was over, elections were held and the PTI came into power, which is still to finish work on the project,” he said, adding it was because of these plants that the country had electricity in surplus.

Former prime minister went on to say that there were some other power projects as well, which the PML-N government had either completed or had launched.

“These included Nheelum Jhelum of 1,000 megawatts Tarbela 4, 1,500 megawatts, two nuclear power plants in Jhelum, 600 megawatts of coal-powered plant at Thar and others, including Nandipur Power Plant,” he elaborated.

Abbasi was of the view that LNG plants produced cheaper electricity not only inside the country, but also outside the country. He said the very idea of importing furnace oil smacked of ‘corruption’.

Comments

Comments are closed.