BR100 Increased By (0.01%)
BR30 Increased By (0.53%)
KSE100 Increased By (0.28%)
KSE30 Increased By (0.29%)
AGHA 6.38 Increased By ▲ 0.06 (0.95%)
BECO 4.35 Increased By ▲ 0.08 (1.87%)
BML 62.55 Increased By ▲ 0.10 (0.16%)
BOP 31.39 Increased By ▲ 0.16 (0.51%)
CNERGY 11.73 Increased By ▲ 0.14 (1.21%)
CSIL 5.91 Increased By ▲ 0.19 (3.32%)
FCCL 61.71 Increased By ▲ 0.17 (0.28%)
FFL 14.79 Decreased By ▼ -0.23 (-1.53%)
FNEL 1.24 Increased By ▲ 0.01 (0.81%)
KEL 6.32 Increased By ▲ 0.06 (0.96%)
KOSM 5.90 Increased By ▲ 0.34 (6.12%)
LOTCHEM 24.69 Increased By ▲ 0.01 (0.04%)
MLCF 103.93 Decreased By ▼ -0.15 (-0.14%)
NBP 173.32 Decreased By ▼ -1.96 (-1.12%)
NCPL 51.83 Decreased By ▼ -0.94 (-1.78%)
NPL 54.03 Decreased By ▼ -0.09 (-0.17%)
OGDC 315.87 Increased By ▲ 2.48 (0.79%)
PACE 9.26 Increased By ▲ 0.06 (0.65%)
PAEL 35.58 Decreased By ▼ -0.22 (-0.61%)
PIBTL 13.66 Increased By ▲ 0.19 (1.41%)
PPL 226.07 Increased By ▲ 4.26 (1.92%)
PRL 80.28 Increased By ▲ 1.20 (1.52%)
PTC 46.64 Decreased By ▼ -0.21 (-0.45%)
SSGC 23.82 Decreased By ▼ -0.05 (-0.21%)
TBL 9.24 Decreased By ▼ -0.07 (-0.75%)
TELE 7.55 Increased By ▲ 0.16 (2.17%)
TPL 24.54 Decreased By ▼ -0.57 (-2.27%)
TPLP 12.99 Increased By ▲ 0.48 (3.84%)
TREET 25.98 Decreased By ▼ -0.27 (-1.03%)
TRG 53.33 Decreased By ▼ -0.11 (-0.21%)
Business & Finance

Nissan ends production at historic Barcelona plant

Published Updated
By

MADRID: The last vehicle was expected to roll off the production line at the historic Barcelona factory of Japanese carmaker Nissan later Thursday ahead of its closure on December 31.

In the meantime, discussions continue as to the future of the site's 3,000-strong work force.

Before the pandemic struck the global economy amidships the Barcelona facility specialising in all-terrain vehicles was churning out some 200,000 cars a year.

Amid reports that Belgian manufacturer Punch could take over the site and use it to house some 2,000 jobs for a hydrogen car project, UGT union secretary general Pepe Alvarez said the closure "makes me very sad."

"Now we have to find a project to continue activity at the site," Alvarez insisted.

Nissan announced in spring last year it was mothballing the site as it sought to contain the fallout of Covid-19, sparking union anger.

After talks, the manufacturer agreed to delay closure to the end of this year from an initially proposed summer 2020 to allow more time for potential rescues for the three-factory complex at Zona Franca, Sant Andreu and Montcada abutting Barcelona's port area.

As the clock ticks down to December 31, uncertainty remains after one potential investor, China's Great Wall Motors (GMW) on Monday shelved a bid first tabled in September to take over the main plant.

"It's bad news," the reindustrialisation commission member admitted. But "there are other projects," notably Punch's hydrogen plan.

Comments

Comments are closed for this article.