AIRLINK 71.69 Decreased By ▼ -2.41 (-3.25%)
BOP 5.00 No Change ▼ 0.00 (0%)
CNERGY 4.39 Increased By ▲ 0.05 (1.15%)
DFML 28.55 Decreased By ▼ -0.99 (-3.35%)
DGKC 82.40 Decreased By ▼ -1.15 (-1.38%)
FCCL 21.95 Decreased By ▼ -0.48 (-2.14%)
FFBL 34.15 Decreased By ▼ -0.75 (-2.15%)
FFL 10.08 Increased By ▲ 0.21 (2.13%)
GGL 10.12 Increased By ▲ 0.12 (1.2%)
HBL 113.00 Increased By ▲ 1.00 (0.89%)
HUBC 140.50 Increased By ▲ 2.81 (2.04%)
HUMNL 8.03 Increased By ▲ 1.05 (15.04%)
KEL 4.38 Decreased By ▼ -0.02 (-0.45%)
KOSM 4.50 Decreased By ▼ -0.09 (-1.96%)
MLCF 38.01 Decreased By ▼ -0.54 (-1.4%)
OGDC 134.69 Decreased By ▼ -1.91 (-1.4%)
PAEL 26.62 Increased By ▲ 1.48 (5.89%)
PIAA 25.40 Decreased By ▼ -1.11 (-4.19%)
PIBTL 6.55 Decreased By ▼ -0.10 (-1.5%)
PPL 121.95 Decreased By ▼ -3.45 (-2.75%)
PRL 27.73 Decreased By ▼ -0.48 (-1.7%)
PTC 13.80 Decreased By ▼ -0.50 (-3.5%)
SEARL 54.89 Increased By ▲ 0.29 (0.53%)
SNGP 69.70 Decreased By ▼ -1.50 (-2.11%)
SSGC 10.40 Decreased By ▼ -0.10 (-0.95%)
TELE 8.50 Decreased By ▼ -0.02 (-0.23%)
TPLP 10.95 Increased By ▲ 0.01 (0.09%)
TRG 60.90 Increased By ▲ 0.20 (0.33%)
UNITY 25.22 Decreased By ▼ -0.11 (-0.43%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
BR100 7,619 Decreased By -45.8 (-0.6%)
BR30 24,969 Decreased By -56.1 (-0.22%)
KSE100 72,761 Decreased By -3 (-0%)
KSE30 23,625 Decreased By -150.3 (-0.63%)

KE had installed efficient combined cycle power plant in Korangi which did operate at full capacity and efficiency with gas turbine inlet cooling but unfortunately, KE removed the inlet cooling installation and thus accepted the dual penalties of lower capacity and reduced efficiency for all the summer months (9-10 months in Karachi), instead of improving the performance.

Kindly note that gas turbine inlet cooling for high efficiency would have resulted in much lower heat rate (less fuel cost) as well as higher power output.

If the load dispatch requirement was less in winter, the same technology could be used to heat the gas turbine inlet air for higher efficiency.

Both the above-described gas turbine inlet air cooling and inlet air heating would provide efficient operation, with less fuel cost and all new combined cycle power plants should have these options for better performance all year round.

(Concluded)

Engr. Ainul Abedin (Karachi)

Copyright Business Recorder, 2021

Comments

Comments are closed.