AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

ISLAMABAD Special Assistant to the Prime Minister on Information and Broadcasting Lt Gen Asim Saleem Bajwa (retd) on Friday said about 80 percent work on the Gwadar East Bay Expressway had been completed. Asim Bajwa who is also Chairman of the CPEC Authority, in a tweet, also shared some pictures of the expressway showing asphalt work underway on the road.

He said the expressway would help boost the port operations. It would prove to be the main artery of Gwadar Port through which the entire traffic of the port would flow. The East Bay Expressway would also provide connectivity of the Gwadar seaport and its Free Zone with the network of National Highways to ensure fast transportation of import, export and transit goods.

Gwadar port is being developed by China and is part of the mega project of China-Pakistan Economic Corridor (CPEC). Currently, the Gwadar deep sea port is connected through a narrow 16 feet wide thoroughfare of Gwadar Town at the West-Bay. All the trawlers, trucks loaded with imported shipments pass through this strip causing disruption of normal traffic.

The port has not a dedicated wide highway to cater the transporting requirements of the post. The port operationalization, even with the available three multi-purpose berths, necessitates construction of the planned East-Bay Expressway. This 6-lane expressway along with a provision of 30 meters wide railway corridor will connect the port with the Mekran Coastal Highway (N-20) through the 2300 acres Free Trade Zone of Gwadar Port.

Comments

Comments are closed.