AIRLINK 78.39 Increased By ▲ 5.39 (7.38%)
BOP 5.34 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.33 Increased By ▲ 0.02 (0.46%)
DFML 30.87 Increased By ▲ 2.32 (8.13%)
DGKC 78.51 Increased By ▲ 4.22 (5.68%)
FCCL 20.58 Increased By ▲ 0.23 (1.13%)
FFBL 32.30 Increased By ▲ 1.40 (4.53%)
FFL 10.22 Increased By ▲ 0.16 (1.59%)
GGL 10.29 Decreased By ▼ -0.10 (-0.96%)
HBL 118.50 Increased By ▲ 2.53 (2.18%)
HUBC 135.10 Increased By ▲ 2.90 (2.19%)
HUMNL 6.87 Increased By ▲ 0.19 (2.84%)
KEL 4.17 Increased By ▲ 0.14 (3.47%)
KOSM 4.73 Increased By ▲ 0.13 (2.83%)
MLCF 38.67 Increased By ▲ 0.13 (0.34%)
OGDC 134.85 Increased By ▲ 1.00 (0.75%)
PAEL 23.40 Decreased By ▼ -0.43 (-1.8%)
PIAA 26.64 Decreased By ▼ -0.49 (-1.81%)
PIBTL 7.02 Increased By ▲ 0.26 (3.85%)
PPL 113.45 Increased By ▲ 0.65 (0.58%)
PRL 27.73 Decreased By ▼ -0.43 (-1.53%)
PTC 14.60 Decreased By ▼ -0.29 (-1.95%)
SEARL 56.50 Increased By ▲ 0.08 (0.14%)
SNGP 66.30 Increased By ▲ 0.50 (0.76%)
SSGC 10.94 Decreased By ▼ -0.07 (-0.64%)
TELE 9.15 Increased By ▲ 0.13 (1.44%)
TPLP 11.67 Decreased By ▼ -0.23 (-1.93%)
TRG 71.43 Increased By ▲ 2.33 (3.37%)
UNITY 24.51 Increased By ▲ 0.80 (3.37%)
WTL 1.33 No Change ▼ 0.00 (0%)
BR100 7,493 Increased By 58.6 (0.79%)
BR30 24,558 Increased By 338.4 (1.4%)
KSE100 72,052 Increased By 692.5 (0.97%)
KSE30 23,808 Increased By 241 (1.02%)

ISLAMABAD Special Assistant to the Prime Minister on Information and Broadcasting Lt Gen Asim Saleem Bajwa (retd) on Friday said about 80 percent work on the Gwadar East Bay Expressway had been completed. Asim Bajwa who is also Chairman of the CPEC Authority, in a tweet, also shared some pictures of the expressway showing asphalt work underway on the road.

He said the expressway would help boost the port operations. It would prove to be the main artery of Gwadar Port through which the entire traffic of the port would flow. The East Bay Expressway would also provide connectivity of the Gwadar seaport and its Free Zone with the network of National Highways to ensure fast transportation of import, export and transit goods.

Gwadar port is being developed by China and is part of the mega project of China-Pakistan Economic Corridor (CPEC). Currently, the Gwadar deep sea port is connected through a narrow 16 feet wide thoroughfare of Gwadar Town at the West-Bay. All the trawlers, trucks loaded with imported shipments pass through this strip causing disruption of normal traffic.

The port has not a dedicated wide highway to cater the transporting requirements of the post. The port operationalization, even with the available three multi-purpose berths, necessitates construction of the planned East-Bay Expressway. This 6-lane expressway along with a provision of 30 meters wide railway corridor will connect the port with the Mekran Coastal Highway (N-20) through the 2300 acres Free Trade Zone of Gwadar Port.

Comments

Comments are closed.