AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

imageGENEVA: Regular rail service through the world's longest tunnel began on Sunday, carrying passengers deep under the Swiss Alps from Zurich to Lugano.

The famed Gotthard Base Tunnel (GBT) had a ceremonial opening in June, attracting European leaders like German Chancellor Angela Merkel and French President Francois Hollande for its maiden ride.

The Swiss national rail service (SBB) had announced that Sunday would mark the start of normal commercial traffic through the 57-kilometre (35-mile) GBT, which took 17 years to build, at a cost of over 12 billion Swiss francs ($11.8 billion, 11.2 billion euros).

The Swiss news agency ATS reported that the first regular passenger train to use the GBT pulled out of Zurich at 6:09 am (0509 GMT) and arrived in Lugano at 8:17 am, with the tunnel passage shaving a full 30 minutes off the previous travel time for the same route.

"It's Christmas," SBB chief Andreas Meyer was quoted as saying by ATS after the journey was over.

The ambitious GBT project has won praise across Europe for its pioneering efforts to improve connectivity from Rotterdam to the Adriatic.

The Swiss funded tunnel was largely made possible by technical advances in tunnel-boring machines, which replaced the costly and dangerous blast-and-drill method.

The GBT has surpassed Japan's 53.9-kilometre Seikan tunnel as the world's longest train tunnel.

The 50.5-kilometre Channel Tunnel connecting Britain and France has been bumped into third place.

Copyright AFP (Agence France-Press), 2016

Comments

Comments are closed.