AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

imageLAHORE: Lahore Chamber of Commerce & Industry (LCCI) on Monday urged the Lahore Electric Supply Company (LESCO) to resolve the issues of tripping and low voltage at Ferozepur Road Industrial Area.

The LCCI President Sheikh Muhammad Arshad made this demand in a meeting with a delegation of Ferozepur Road Industrial Association (FRIA) led by its Chairman Khawaja Shahzeb Akram here. Adnan Khalid Butt and Arshad Baig were prominent among other members of the delegation.

The delegation informed the LCCI president that tripping and unscheduled loadshedding was damaging the industrial activities in the Ferozepur Road Industrial area.

After listening to their point of view, Sheikh Muhammad Arshad said that the industry needed a continuous supply of electricity to keep the units operational and complete the export orders well within the given timeframe.

He said that cheaper and uninterrupted power supply was the only way to achieve economic targets set for the year 2016-17.

The LCCI President said that Ferozepur Road Industrial Area was facing tripping, low voltage and unscheduled loadshedding, therefore LESCO should resolve this issue at the earliest.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.