BR100 Increased By (0.55%)
BR30 Increased By (0.73%)
KSE100 Increased By (0.1%)
KSE30 Increased By (0.13%)
AGHA 7.47 Decreased By ▼ -0.09 (-1.19%)
BECO 5.15 Increased By ▲ 0.06 (1.18%)
BML 55.00 Increased By ▲ 0.02 (0.04%)
BOP 32.86 Decreased By ▼ -0.12 (-0.36%)
CNERGY 10.36 Increased By ▲ 0.26 (2.57%)
CSIL 5.10 Decreased By ▼ -0.03 (-0.58%)
FCCL 52.30 Increased By ▲ 1.05 (2.05%)
FFL 16.59 Increased By ▲ 0.41 (2.53%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.22 Increased By ▲ 0.16 (2.27%)
KOSM 5.84 Increased By ▲ 0.30 (5.42%)
LOTCHEM 27.18 Decreased By ▼ -1.94 (-6.66%)
MLCF 90.30 Increased By ▲ 1.48 (1.67%)
NBP 196.85 Decreased By ▼ -0.64 (-0.32%)
NCPL 55.55 Increased By ▲ 0.53 (0.96%)
NPL 65.20 Increased By ▲ 0.32 (0.49%)
OGDC 313.90 Increased By ▲ 1.95 (0.63%)
PACE 10.44 Increased By ▲ 0.23 (2.25%)
PAEL 41.24 Increased By ▲ 0.25 (0.61%)
PIBTL 16.14 Increased By ▲ 0.18 (1.13%)
PPL 213.99 Increased By ▲ 1.33 (0.63%)
PRL 54.10 Increased By ▲ 1.56 (2.97%)
PTC 70.00 Increased By ▲ 0.92 (1.33%)
SSGC 25.27 Increased By ▲ 0.17 (0.68%)
TBL 9.65 Increased By ▲ 0.03 (0.31%)
TELE 8.37 Increased By ▲ 0.05 (0.6%)
TPL 18.20 Increased By ▲ 0.45 (2.54%)
TPLP 13.14 Decreased By ▼ -0.08 (-0.61%)
TREET 21.45 Decreased By ▼ -0.29 (-1.33%)
TRG 59.89 Increased By ▲ 3.00 (5.27%)

imageLAHORE: Lahore Chamber of Commerce & Industry (LCCI) on Monday urged the Lahore Electric Supply Company (LESCO) to resolve the issues of tripping and low voltage at Ferozepur Road Industrial Area.

The LCCI President Sheikh Muhammad Arshad made this demand in a meeting with a delegation of Ferozepur Road Industrial Association (FRIA) led by its Chairman Khawaja Shahzeb Akram here. Adnan Khalid Butt and Arshad Baig were prominent among other members of the delegation.

The delegation informed the LCCI president that tripping and unscheduled loadshedding was damaging the industrial activities in the Ferozepur Road Industrial area.

After listening to their point of view, Sheikh Muhammad Arshad said that the industry needed a continuous supply of electricity to keep the units operational and complete the export orders well within the given timeframe.

He said that cheaper and uninterrupted power supply was the only way to achieve economic targets set for the year 2016-17.

The LCCI President said that Ferozepur Road Industrial Area was facing tripping, low voltage and unscheduled loadshedding, therefore LESCO should resolve this issue at the earliest.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.