AIRLINK 72.13 Increased By ▲ 2.93 (4.23%)
BOP 5.04 Increased By ▲ 0.14 (2.86%)
CNERGY 4.32 Increased By ▲ 0.06 (1.41%)
DFML 31.40 Increased By ▲ 0.15 (0.48%)
DGKC 80.37 Increased By ▲ 3.12 (4.04%)
FCCL 21.03 Increased By ▲ 1.03 (5.15%)
FFBL 34.82 Decreased By ▼ -0.18 (-0.51%)
FFL 9.17 Increased By ▲ 0.05 (0.55%)
GGL 9.81 Increased By ▲ 0.01 (0.1%)
HBL 113.40 Increased By ▲ 0.64 (0.57%)
HUBC 134.20 Increased By ▲ 1.16 (0.87%)
HUMNL 7.02 Increased By ▲ 0.07 (1.01%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.20 Increased By ▲ 0.60 (1.64%)
OGDC 135.40 Increased By ▲ 2.53 (1.9%)
PAEL 23.69 Increased By ▲ 1.05 (4.64%)
PIAA 24.60 Increased By ▲ 0.40 (1.65%)
PIBTL 6.52 Increased By ▲ 0.06 (0.93%)
PPL 120.40 Increased By ▲ 4.10 (3.53%)
PRL 26.33 Increased By ▲ 0.43 (1.66%)
PTC 13.20 Increased By ▲ 0.12 (0.92%)
SEARL 52.40 Increased By ▲ 0.40 (0.77%)
SNGP 71.40 Increased By ▲ 3.80 (5.62%)
SSGC 10.60 Increased By ▲ 0.06 (0.57%)
TELE 8.40 Increased By ▲ 0.12 (1.45%)
TPLP 11.11 Increased By ▲ 0.31 (2.87%)
TRG 60.51 Increased By ▲ 1.22 (2.06%)
UNITY 25.21 Increased By ▲ 0.08 (0.32%)
WTL 1.27 No Change ▼ 0.00 (0%)
BR100 7,490 Increased By 81.2 (1.1%)
BR30 24,512 Increased By 475.5 (1.98%)
KSE100 71,505 Increased By 838.4 (1.19%)
KSE30 23,444 Increased By 220 (0.95%)

imageISLAMABAD: The recoveries of power sector touched to record 93.40 per cent resulting additional income of Rs. 61 billion to the national exchequer during 2015.

Official sources told APP here Tuesday that better performance and prudent decisions have brought the much needed stability in the power sector.

He said recoveries witnessed 4.80 percent increased as compared to the previous year where recoveries remained 88.60 percent.

Besides achieving upward trend in recoveries, the line losses were reduced to 18 per cent from 19.1 per cent during the said period, the sources said.

They said record Rs10 billion was saved on account of reducing line losses to around 1.1 percent.

They said that 50 percent power load-shedding has reduced owing to the steps taken by the government.

They said power tariff was not only reduced but also the industrial sector was fully exempted from power load-shedding for the first time in the country's history to meet the export orders.

The sources said six to eight hour power load shedding was being carried out in the urban and rural areas of the country.

They said that the government has expedited work on various power projects having accumulative capacity of 10,500 MW with the assistance of China. The menace of load-shedding would be over after completion of this short term power projects, they added.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.