AIRLINK 74.50 Decreased By ▼ -2.48 (-3.22%)
BOP 4.73 Decreased By ▼ -0.14 (-2.87%)
CNERGY 4.14 Decreased By ▼ -0.08 (-1.9%)
DFML 39.35 Decreased By ▼ -2.44 (-5.84%)
DGKC 84.90 Increased By ▲ 0.17 (0.2%)
FCCL 21.90 Decreased By ▼ -0.49 (-2.19%)
FFBL 30.21 Decreased By ▼ -1.24 (-3.94%)
FFL 9.25 Decreased By ▼ -0.10 (-1.07%)
GGL 10.40 Increased By ▲ 0.24 (2.36%)
HASCOL 6.33 Decreased By ▼ -0.08 (-1.25%)
HBL 108.25 Decreased By ▼ -0.35 (-0.32%)
HUBC 140.25 Decreased By ▼ -0.24 (-0.17%)
HUMNL 10.30 Decreased By ▼ -0.22 (-2.09%)
KEL 4.80 Decreased By ▼ -0.05 (-1.03%)
KOSM 4.42 Increased By ▲ 0.19 (4.49%)
MLCF 37.50 Decreased By ▼ -0.19 (-0.5%)
OGDC 124.64 Decreased By ▼ -2.00 (-1.58%)
PAEL 24.44 Decreased By ▼ -0.59 (-2.36%)
PIBTL 6.20 Decreased By ▼ -0.06 (-0.96%)
PPL 116.40 Increased By ▲ 0.11 (0.09%)
PRL 24.60 Decreased By ▼ -1.14 (-4.43%)
PTC 13.13 Decreased By ▼ -0.47 (-3.46%)
SEARL 55.99 Decreased By ▼ -0.60 (-1.06%)
SNGP 62.98 Decreased By ▼ -0.22 (-0.35%)
SSGC 9.87 Decreased By ▼ -0.11 (-1.1%)
TELE 7.99 Decreased By ▼ -0.01 (-0.13%)
TPLP 9.93 Decreased By ▼ -0.21 (-2.07%)
TRG 64.50 Decreased By ▼ -1.52 (-2.3%)
UNITY 26.66 Decreased By ▼ -0.17 (-0.63%)
WTL 1.32 Decreased By ▼ -0.01 (-0.75%)
BR100 7,718 Decreased By -55.6 (-0.72%)
BR30 24,778 Decreased By -185.7 (-0.74%)
KSE100 73,863 Decreased By -356.5 (-0.48%)
KSE30 23,691 Decreased By -88.1 (-0.37%)

imageISLAMABAD: The Ministry of Railways was considering two proposals to establish new rail links between Gwadar and other parts of the country in connection with China-Pak Economic Corridor.

One proposal for linking Gwadar with Karachi along Makran Coastal Highway is 700 km and second aims Linking Gwadar with Jacobabad via Turbat, Punjgur, Besima and Khuzdar is 1048 km, an official of Pakistan Railways told APP.

A PC-II amounting to Rs. 135.500 million for carrying out feasibility studies of the above mentioned proposed links has been approved by Planning Commission for which funding would be provided in fiscal year 2014-15.

The official said that actual ground work would commence after completion of the feasibility study.

The project could be completed by 2017-18 provided the financial and economic viability of the scheme is established and availability of requisite funds is ensured as determined in the feasibility study, he added.

He said the proposals are also a part of China-Pakistan Economic Corridor framework.

Comments

Comments are closed.