AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,566 Increased By 157.7 (2.13%)
BR30 24,786 Increased By 749.4 (3.12%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

imageISLAMABAD: Minister for Petroleum and Natural Resources Shahid Khaqan Abbasi on Thursday informed the Senate that International Court of Arbitration would announce verdict on Kishenganga Hydroelectric project by the end of current month.

On behalf of Minister of Water and Power, Shahid Khaqan Abbasi in the question hours, said that, the Kishenganga Hydroelectric plant is under construction by India and it is located in Occupied Jammu and Kashmir on river Neelum.

Gross capacity of the reservoir is 18.80 million Cubic Meter or 14,900 acre feet with dead storage of 8755 acre feet and an operating poll of 6120 acre feet.

The water of river Kishenganga is to be diverted through a 23 krri long tunnel to produce 330 mw powers.

The water after production of power will join the Wullar Lake and ultimately flow down through Jhelum to Muzaffarabad.

The Minister informed the House that India was allowed to construct Run-of-River hydroelectric plants and limited storage works on the Western Rivers (Indus Jhelum and Chenab) within the limits of design criteria provided in the relevant provisions of the Indus Waters Treaty 1960.

He said India is bound to provide detailed information and design data regarding the proposed projects.

The minister said all the dams constructed by India on Pakistan's Western Rivers so for are Run-of-River Hydroelectric Plants which do not involve any consumption of water therefore no reduction in flow coming to Pakistan has been noticed or likely to occur on account of the dams constructed for hydropower generation.

Comments

Comments are closed.