AIRLINK 79.10 Decreased By ▼ -0.31 (-0.39%)
BOP 5.35 Increased By ▲ 0.02 (0.38%)
CNERGY 4.32 Decreased By ▼ -0.06 (-1.37%)
DFML 33.55 Increased By ▲ 0.36 (1.08%)
DGKC 76.00 Decreased By ▼ -0.87 (-1.13%)
FCCL 20.41 Decreased By ▼ -0.12 (-0.58%)
FFBL 31.35 Decreased By ▼ -0.05 (-0.16%)
FFL 9.85 No Change ▼ 0.00 (0%)
GGL 10.20 Decreased By ▼ -0.05 (-0.49%)
HBL 117.99 Increased By ▲ 0.06 (0.05%)
HUBC 134.64 Increased By ▲ 0.54 (0.4%)
HUMNL 7.00 No Change ▼ 0.00 (0%)
KEL 4.60 Decreased By ▼ -0.07 (-1.5%)
KOSM 4.65 Decreased By ▼ -0.09 (-1.9%)
MLCF 37.22 Decreased By ▼ -0.22 (-0.59%)
OGDC 136.00 Decreased By ▼ -0.70 (-0.51%)
PAEL 23.10 Decreased By ▼ -0.05 (-0.22%)
PIAA 26.90 Increased By ▲ 0.35 (1.32%)
PIBTL 6.84 Decreased By ▼ -0.16 (-2.29%)
PPL 113.60 Decreased By ▼ -0.15 (-0.13%)
PRL 27.43 Decreased By ▼ -0.09 (-0.33%)
PTC 14.81 Increased By ▲ 0.06 (0.41%)
SEARL 57.08 Decreased By ▼ -0.12 (-0.21%)
SNGP 66.80 Decreased By ▼ -0.70 (-1.04%)
SSGC 11.13 Increased By ▲ 0.04 (0.36%)
TELE 9.22 Decreased By ▼ -0.01 (-0.11%)
TPLP 11.60 Increased By ▲ 0.04 (0.35%)
TRG 72.55 Increased By ▲ 0.45 (0.62%)
UNITY 24.79 Decreased By ▼ -0.03 (-0.12%)
WTL 1.40 No Change ▼ 0.00 (0%)
BR100 7,536 Increased By 10.2 (0.14%)
BR30 24,596 Decreased By -53.7 (-0.22%)
KSE100 72,080 Increased By 108.9 (0.15%)
KSE30 23,772 Increased By 22.6 (0.09%)
Pakistan

Wind power plant of 200 MW to be installed in Sindh: Omar Ayub

Omar Ayub said that the Sindh government did not give right of way for gas pipeline which resulted in gas shortage.
Published February 7, 2020
  • Omar Ayub said that the Sindh government did not give right of way for gas pipeline which resulted in gas shortage. Had it given the right of way timely,
  • NEPRA has already taken action against the K-Electric and the people of Karachi have elected the PTI, he said, Prime Minister Imran Khan fully support the genuine demands of people of Karachi.

KARACHI: Federal Minister for Energy Omar Ayub Khan said that electricity load shedding has already been ended at around 80 per cent feeders in the country and action would be continued against electricity thieves.

He said in a chat with newsmen after attending a reception hosted in his honor at the residence of Pakistan Tehreek-e-Insaf (PTI) Vice President and parliamentary party leader in Sindh Assembly Haleem Adil Sheikh here, said a statement on Friday.

Omar Ayub said that a wind power plant of 200 megawatts would be installed in Sindh.

Special Assistant of Prime Minister on Petroleum Nadeem Baber also accompanied the Federal Minister.

Omar Ayub said that the Sindh government, itself, is responsible for the gas shortage.

He said that the Sindh government did not give right of way for gas pipeline which resulted in gas shortage. Had it given the right of way timely, the gas pressure problems would not have been faced, he added.

He said that it was totally wrong that the gas share of Sindh is being given to other provinces.

The federal minister said that we have started the process of digging up wells to discover gas.

He said that the PTI government overcome the load shedding problem during last Ramzan.

Omar Ayub said that projects to generate expensive electricity were installed during the tenures of previous governments and resultantly the tariff of electricity increased. Present government is closing down these costly projects, he added.

He said that the vision of Prime Minister is to give basic facilities to people.

NEPRA has already taken action against the K-Electric and the people of Karachi have elected the PTI, he said, Prime Minister Imran Khan fully support the genuine demands of people of Karachi.

Speaking on the occasion, Haleem Adil Sheikh said that it is in correct that gas share of Sindh is given to other provinces.

He said that our Energy Ministry is working in an efficient manner. Omar Ayub belongs to a great family and we are grateful to him for his visit.

 

Comments

Comments are closed.