AIRLINK 74.20 Decreased By ▼ -0.96 (-1.28%)
BOP 5.41 Decreased By ▼ -0.04 (-0.73%)
CNERGY 4.36 Decreased By ▼ -0.03 (-0.68%)
DFML 29.06 Increased By ▲ 1.42 (5.14%)
DGKC 77.14 Increased By ▲ 5.14 (7.14%)
FCCL 20.70 Increased By ▲ 0.41 (2.02%)
FFBL 31.10 Increased By ▲ 0.05 (0.16%)
FFL 10.15 Increased By ▲ 0.18 (1.81%)
GGL 10.64 Increased By ▲ 0.37 (3.6%)
HBL 114.40 Decreased By ▼ -0.60 (-0.52%)
HUBC 131.01 Decreased By ▼ -0.44 (-0.33%)
HUMNL 6.80 Decreased By ▼ -0.07 (-1.02%)
KEL 4.07 Decreased By ▼ -0.13 (-3.1%)
KOSM 4.71 Decreased By ▼ -0.06 (-1.26%)
MLCF 39.78 Increased By ▲ 2.70 (7.28%)
OGDC 134.72 Decreased By ▼ -0.73 (-0.54%)
PAEL 24.32 Increased By ▲ 0.92 (3.93%)
PIAA 27.59 Increased By ▲ 0.28 (1.03%)
PIBTL 6.68 Increased By ▲ 0.08 (1.21%)
PPL 113.65 Increased By ▲ 0.49 (0.43%)
PRL 28.65 Decreased By ▼ -0.10 (-0.35%)
PTC 15.25 Decreased By ▼ -0.25 (-1.61%)
SEARL 57.30 Decreased By ▼ -0.03 (-0.05%)
SNGP 66.98 Decreased By ▼ -0.01 (-0.01%)
SSGC 11.15 Decreased By ▼ -0.02 (-0.18%)
TELE 9.14 No Change ▼ 0.00 (0%)
TPLP 12.05 No Change ▼ 0.00 (0%)
TRG 70.40 Increased By ▲ 0.01 (0.01%)
UNITY 23.94 Increased By ▲ 0.29 (1.23%)
WTL 1.32 Decreased By ▼ -0.02 (-1.49%)
BR100 7,466 Increased By 10.6 (0.14%)
BR30 24,346 Increased By 96.4 (0.4%)
KSE100 71,575 Increased By 141.2 (0.2%)
KSE30 23,608 Increased By 41.3 (0.18%)
Pakistan

Wind power plant of 200 MW to be installed in Sindh: Omar Ayub

Omar Ayub said that the Sindh government did not give right of way for gas pipeline which resulted in gas shortage.
Published February 7, 2020
  • Omar Ayub said that the Sindh government did not give right of way for gas pipeline which resulted in gas shortage. Had it given the right of way timely,
  • NEPRA has already taken action against the K-Electric and the people of Karachi have elected the PTI, he said, Prime Minister Imran Khan fully support the genuine demands of people of Karachi.

KARACHI: Federal Minister for Energy Omar Ayub Khan said that electricity load shedding has already been ended at around 80 per cent feeders in the country and action would be continued against electricity thieves.

He said in a chat with newsmen after attending a reception hosted in his honor at the residence of Pakistan Tehreek-e-Insaf (PTI) Vice President and parliamentary party leader in Sindh Assembly Haleem Adil Sheikh here, said a statement on Friday.

Omar Ayub said that a wind power plant of 200 megawatts would be installed in Sindh.

Special Assistant of Prime Minister on Petroleum Nadeem Baber also accompanied the Federal Minister.

Omar Ayub said that the Sindh government, itself, is responsible for the gas shortage.

He said that the Sindh government did not give right of way for gas pipeline which resulted in gas shortage. Had it given the right of way timely, the gas pressure problems would not have been faced, he added.

He said that it was totally wrong that the gas share of Sindh is being given to other provinces.

The federal minister said that we have started the process of digging up wells to discover gas.

He said that the PTI government overcome the load shedding problem during last Ramzan.

Omar Ayub said that projects to generate expensive electricity were installed during the tenures of previous governments and resultantly the tariff of electricity increased. Present government is closing down these costly projects, he added.

He said that the vision of Prime Minister is to give basic facilities to people.

NEPRA has already taken action against the K-Electric and the people of Karachi have elected the PTI, he said, Prime Minister Imran Khan fully support the genuine demands of people of Karachi.

Speaking on the occasion, Haleem Adil Sheikh said that it is in correct that gas share of Sindh is given to other provinces.

He said that our Energy Ministry is working in an efficient manner. Omar Ayub belongs to a great family and we are grateful to him for his visit.

 

Comments

Comments are closed.