AIRLINK 75.90 Decreased By ▼ -4.10 (-5.13%)
BOP 5.18 No Change ▼ 0.00 (0%)
CNERGY 4.50 Increased By ▲ 0.04 (0.9%)
DFML 35.30 Increased By ▲ 0.14 (0.4%)
DGKC 77.25 Increased By ▲ 0.37 (0.48%)
FCCL 20.12 Increased By ▲ 0.14 (0.7%)
FFBL 36.31 Increased By ▲ 0.71 (1.99%)
FFL 9.50 Decreased By ▼ -0.03 (-0.31%)
GGL 10.02 Decreased By ▼ -0.14 (-1.38%)
HBL 117.26 Increased By ▲ 0.26 (0.22%)
HUBC 132.50 No Change ▼ 0.00 (0%)
HUMNL 7.00 Decreased By ▼ -0.06 (-0.85%)
KEL 4.61 Decreased By ▼ -0.04 (-0.86%)
KOSM 4.62 Decreased By ▼ -0.03 (-0.65%)
MLCF 36.99 Decreased By ▼ -0.51 (-1.36%)
OGDC 133.75 Decreased By ▼ -0.72 (-0.54%)
PAEL 23.12 Increased By ▲ 0.22 (0.96%)
PIAA 26.50 Decreased By ▼ -0.13 (-0.49%)
PIBTL 6.73 Decreased By ▼ -0.08 (-1.17%)
PPL 111.75 Decreased By ▼ -0.35 (-0.31%)
PRL 27.62 Increased By ▲ 0.42 (1.54%)
PTC 14.40 Increased By ▲ 0.02 (0.14%)
SEARL 55.81 Decreased By ▼ -0.58 (-1.03%)
SNGP 67.31 Increased By ▲ 0.31 (0.46%)
SSGC 10.88 Increased By ▲ 0.05 (0.46%)
TELE 9.22 Decreased By ▼ -0.07 (-0.75%)
TPLP 11.00 Decreased By ▼ -0.18 (-1.61%)
TRG 67.06 Decreased By ▼ -1.94 (-2.81%)
UNITY 25.25 Decreased By ▼ -0.24 (-0.94%)
WTL 1.32 No Change ▼ 0.00 (0%)
BR100 7,530 Increased By 8.3 (0.11%)
BR30 24,368 Decreased By -34.6 (-0.14%)
KSE100 71,693 Decreased By -2.4 (-0%)
KSE30 23,546 Increased By 3.7 (0.02%)
Business & Finance

Power supply to Dhabeji pumping station restored on priority: K-Electric

KARACHI: K-Electric priorities power supply to all strategic locations of Karachi Water and Sewerage Board (KWSB) in
Published June 15, 2019

KARACHI: K-Electric priorities power supply to all strategic locations of Karachi Water and Sewerage Board (KWSB) including the pumping stations at Dhabeji, Pipri and Gharo.

K-Electric spokesperson said here on Saturday that the power utility's maintenance and repair teams were immediately mobilized  or swift restoration of supply.

The teams worked tirelessly while adhering to all safety parameters and ensured timely rectification of the fault.

All KWSB major water pumping stations are exempt from load-shed in the greater interest of the people of Karachi, he added.

In addition to ensuring seamless power supply to all strategic installations of KWSB, KE also extends all possible technical support and maintains close coordination with KWSB teams round the clock.

The power utility has also deputed a dedicated technical team for priority resolution of any technical issues at KWSB strategic facilities and KE teams also periodically conduct surveys at Dhabeji and other strategic installations of KW&SB to ensure KE operations remain seamless.

Copyright APP (Associated Press of Pakistan), 2019
 

Comments

Comments are closed.