AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)
Top News

Diamer-Bhasha dam: Govt to seek Chinese funding

RECORDER REPORT ISLAMABAD: Government has decided to seek funds from China to finance $ 14.4 billion Diamer-Bhasha da
Published December 1, 2012

diamer-bhasha-damRECORDER REPORT

ISLAMABAD: Government has decided to seek funds from China to finance $ 14.4 billion Diamer-Bhasha dam project. Special Secretary Ministry of Water and Power Himayat Ullah Khan informed the National Assembly’s Standing Committee on Water and Power here on Friday, which directed him to provide complete details as to why the installation of Nandi Pur Power Project was delayed, causing billions of rupee loss to the national kitty.

 

“China may not be able to provide whole of the required funds, however, it can contribute a major portion for Diamer Bhasha dam,” Special Secretary informed the committee, which met here with Syed Ghulam Mustafa Shah in the chair.  He further said that country would be depending on most expensive thermal power generation owing to decline in hydel power generation in coming month of December as canals would be closed for desilting.

 

“Decline in power generation is mainly because of decline in hydel generation which has come down to 30 percent at present against 70 percent of total energy mix few years back,” he said adding that power generation cost through furnace oil is Rs.17 per unit, hydel Rs.1.5 per unit, gas based generation is Rs.4 per unit.

 

“After December 20, country would be left with no option, but to go for more expensive power generation through furnace oil/diesel,” he said adding that power generation through diesel would cost Rs.22 to Rs.27 per unit to government. He said that power consumers were paying Rs.8.88 per unit whereas Rs 3.50 per unit subsidy was being borne by the government. Member Committee Ch. Abid Sher Ali said that 650 MW power was being exported from Punjab to Karachi despite severe power shortfall in the industrial city of Faisalabad. He also raised the issue of long delay in Nandipur Power project which resulted in shortage of power for industrial consumers in Faisalabad.

 

Special Secretary admitted before the committee that long delay has been caused, adding that “right now the matter is pending in the Supreme Court of Pakistan.” Other Members of the committee including Pir Aslam Bodla and Bilal Yasin demanded to lift ban on collecting power bills in installments to facilitate the poor who had lost their capacity of paying huge power bills. Special Secretary agreed to consider this and informed that payment in installment would be allowed in exceptional cases only and current bill would need to be paid within due date.

Comments

Comments are closed.