AIRLINK 73.18 Increased By ▲ 0.38 (0.52%)
BOP 5.00 Decreased By ▼ -0.06 (-1.19%)
CNERGY 4.37 Increased By ▲ 0.04 (0.92%)
DFML 29.95 Decreased By ▼ -0.57 (-1.87%)
DGKC 91.39 Increased By ▲ 5.44 (6.33%)
FCCL 23.15 Increased By ▲ 0.80 (3.58%)
FFBL 33.50 Increased By ▲ 0.28 (0.84%)
FFL 9.92 Increased By ▲ 0.14 (1.43%)
GGL 10.35 Decreased By ▼ -0.05 (-0.48%)
HBL 113.01 Decreased By ▼ -0.61 (-0.54%)
HUBC 136.28 Increased By ▲ 0.08 (0.06%)
HUMNL 9.60 Decreased By ▼ -0.43 (-4.29%)
KEL 4.78 Increased By ▲ 0.12 (2.58%)
KOSM 4.72 Increased By ▲ 0.32 (7.27%)
MLCF 39.89 Increased By ▲ 1.54 (4.02%)
OGDC 133.90 Increased By ▲ 0.50 (0.37%)
PAEL 28.85 Increased By ▲ 1.45 (5.29%)
PIAA 25.00 Increased By ▲ 0.24 (0.97%)
PIBTL 6.94 Increased By ▲ 0.39 (5.95%)
PPL 122.40 Increased By ▲ 1.19 (0.98%)
PRL 27.40 Increased By ▲ 0.25 (0.92%)
PTC 14.80 Increased By ▲ 0.91 (6.55%)
SEARL 60.40 No Change ▼ 0.00 (0%)
SNGP 70.29 Increased By ▲ 1.76 (2.57%)
SSGC 10.42 Increased By ▲ 0.09 (0.87%)
TELE 8.85 Decreased By ▼ -0.20 (-2.21%)
TPLP 11.32 Increased By ▲ 0.06 (0.53%)
TRG 66.57 Increased By ▲ 0.87 (1.32%)
UNITY 25.20 Decreased By ▼ -0.05 (-0.2%)
WTL 1.55 Increased By ▲ 0.05 (3.33%)
BR100 7,674 Increased By 40.1 (0.53%)
BR30 25,457 Increased By 285.1 (1.13%)
KSE100 73,086 Increased By 427.5 (0.59%)
KSE30 23,427 Increased By 44.5 (0.19%)

The Competition Commission of Pakistan (CCP) has passed an order disposing of the matter against Khyber Pakhtunkhwa Directorate of Agriculture Engineering for alleged violation of Section 3 & 4 of the Competition Act, 2010; whereby the restrictive trading conditions are imposed in its tender for procurement and installation of 'Deep Solar Pumping Systems on Agriculture Tube-wells/open-wells.'

Catkin Engineering sent a formal complaint to the CCP alleging that KP Directorate of Agriculture Engineering had included certain unfair trading conditions in the tender for procurement and installation of Deep Solar Pumping Systems on Agriculture Tube-wells/open-wells, thus making the tender anti-competitive and in violation of Section 4 of the Competition Act.

As per the complainant, the Directorate in its tender required the firms to have registration with Khyber Pakhtunkhwa Revenue Authority (KPRA); must have PKR 200 million average turnover for the last three years in solar pumping systems; should have experience of projects of similar and complex nature worth PKR 10 million completed in last five years; and should have test bed for verification/testing of solar pumps along with all accessories as per ISO 9906 in company premises (firm must have third party certification regarding test bed arrangements).

The CCP's enquiry examined all the clauses separately to see whether there was any violation of the Competition Act or not. In its order, the CCP's bench stated that the complainant had failed to establish any violation of the Competition Act in the tender.

Regarding the first condition, the order stated that registration with KPRA is the same as obtaining a National Tax Number (NTN) from the Federal Board of Revenue (FBR) i.e. a person/entity does not have to be actually paying any taxes to obtain an NTN. It also observed that registration with KPRA can be done online through its website. Therefore, it appears that this clause does not adversely impact competition.

Regarding the second condition of Rs200 Million average turnover requirement, the order stated that the PEC recommendation is for the firm to maintain an average turnover over a five-year period; however, the bidding document requires turnover to be maintained over a three-year period which appears to be less stringent since it would be easier for a firm to maintain a certain level of sales over 3 years rather than five years. Therefore, this clause does not appear to impede competition.

The order noted, that the burden of proof rests with the Complainant who has failed to substantiate as to how the impugned clause is restrictive of competition and the condition about Rs 10 million worth of projects in last five year does not appear to be anti-competitive as the value of the project is much bigger.-PR