AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

SARAJEVO: Bosnia signed loan agreements worth 85 million euros ($94 million) on Thursday with the European Bank for Reconstruction and Development (EBRD)and the European Union to help build part of a strategic north-south highway running through the country.

The 6.1-kilometre section and two interchanges to be built in northeastern Bosnia will be financed with a 70 million euro loan from EBRD and with the EU's investment grant of 15 million euros, officials said.

The pan-European VC corridor linking Hungarian capital Budapest in the north with the Croatian port of Ploce in the south is the main international transport link in Bosnia. It is expected to be completed by 2030 and its total cost is estimated at about 4 billion euros.

Separately on Thursday, the Bosnian regional motorways company Autoceste FBiH signed a 59.4 million euro deal with a local company to build another stretch of the Corridor VC in central Bosnia.

The Euro-Asfalt company will build a 2.65 km sub-section, including a 2.47 km tunnel from Ponirak to Vraca in central Bosnia. The construction will be financed with a 50 million euro loan from the European Investment Bank (EIB) and a 19 million euros grant from the Western Balkans Investment Fund.

The construction should be completed in 30 months, officials said.

Autoceste FBiH has built 105 km of the 335 km-long stretch of the Corridor VC passing through Bosnia's autonomous Bosniak-Croat Federation.

Copyright Reuters, 2019

Comments

Comments are closed.