BR100 Increased By (1.44%)
BR30 Increased By (1.71%)
KSE100 Increased By (1.15%)
KSE30 Increased By (1.21%)
BECO 5.65 Increased By ▲ 0.06 (1.07%)
BML 62.00 Increased By ▲ 0.97 (1.59%)
BOP 33.85 Increased By ▲ 0.60 (1.8%)
CNERGY 8.16 Increased By ▲ 0.11 (1.37%)
DCL 11.52 Increased By ▲ 0.22 (1.95%)
FCCL 53.80 Increased By ▲ 0.87 (1.64%)
FCSC 5.45 Increased By ▲ 0.11 (2.06%)
FFL 17.88 Increased By ▲ 0.27 (1.53%)
FNEL 1.33 Increased By ▲ 0.02 (1.53%)
HUMNL 11.10 Decreased By ▼ -0.02 (-0.18%)
KEL 8.05 Increased By ▲ 0.16 (2.03%)
KOSM 5.39 Increased By ▲ 0.06 (1.13%)
MLCF 86.77 Increased By ▲ 1.42 (1.66%)
NBP 184.50 Increased By ▲ 3.21 (1.77%)
PACE 11.70 Increased By ▲ 0.17 (1.47%)
PAEL 40.50 Increased By ▲ 1.09 (2.77%)
PIAHCLA 25.99 Increased By ▲ 0.36 (1.4%)
PIBTL 17.39 Increased By ▲ 0.24 (1.4%)
PPL 228.06 Increased By ▲ 3.24 (1.44%)
PRL 34.60 Increased By ▲ 0.42 (1.23%)
PTC 66.00 Increased By ▲ 0.92 (1.41%)
SEARL 90.95 Increased By ▲ 1.35 (1.51%)
SSGC 26.74 Increased By ▲ 0.43 (1.63%)
TELE 8.50 Increased By ▲ 0.12 (1.43%)
THCCL 71.42 Increased By ▲ 2.08 (3%)
TPLP 10.98 Increased By ▲ 0.70 (6.81%)
TREET 24.54 Increased By ▲ 0.34 (1.4%)
TRG 70.92 Increased By ▲ 1.38 (1.98%)
WAVES 11.35 Increased By ▲ 0.32 (2.9%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)

KARACHI: Sindh Chief Minister Syed Murad Ali Shah on Sunday during visit to under-construction Landhi Medical College building directed to release additional fund of Rs 150 million within a week so as to complete remaining work of the college.

The chief minister was told that the project was started some four year ago at Rs 1200 million in which revenue component was Rs 500 million, said a statement. It was also told that the government has released Rs 650 million and the entire amount has been utilized.

The chief minister was told that Rs 150 million additional fund was required to complete the project.

The chief minister directed Finance Department to release the amount within a week so that the remaining work of the college could be completed.

The chief minister said that the completion of the college would benefit to the local people of Landhi and rest of the city as well. "This project is very important and must be completed within next five months," he directed DC Korangi Shaharyar Memon and directed him to keep posting progress of the project to him regularly.

Meanwhile, the Sindh chief minister also visited two under-construction flyovers, at Korangi no. 5 and Korangi no.2.1/2.

Project Director Khalid Masroor told the chief minister that the cost of each flyover was Rs 335 million and each flyover was 500 meters long and would make entire 12000 Road signal free.

The chief minister reviewed the progress of the work and directed the PD Khalid to complete both the flyovers by September 2019.

The chief minister expressed his displeasure on cleanning work and lifting of garbage from the Korangi district.

He directed Sindh Minister Local Government for taking action against the concerned officers for their failure to keep their district neat and clean.

Copyright APP (Associated Press of Pakistan), 2019

Comments

Comments are closed for this article.