AIRLINK 74.00 Decreased By ▼ -0.56 (-0.75%)
BOP 5.02 Decreased By ▼ -0.04 (-0.79%)
CNERGY 4.42 Decreased By ▼ -0.04 (-0.9%)
DFML 39.20 Decreased By ▼ -0.53 (-1.33%)
DGKC 86.09 Decreased By ▼ -1.46 (-1.67%)
FCCL 21.65 Decreased By ▼ -0.28 (-1.28%)
FFBL 34.01 Decreased By ▼ -0.58 (-1.68%)
FFL 9.92 Increased By ▲ 0.17 (1.74%)
GGL 10.56 Increased By ▲ 0.07 (0.67%)
HBL 113.89 Increased By ▲ 0.10 (0.09%)
HUBC 135.84 Decreased By ▼ -0.68 (-0.5%)
HUMNL 11.90 Increased By ▲ 1.00 (9.17%)
KEL 4.84 Increased By ▲ 0.17 (3.64%)
KOSM 4.53 Decreased By ▼ -0.11 (-2.37%)
MLCF 38.27 Decreased By ▼ -0.19 (-0.49%)
OGDC 134.85 Decreased By ▼ -1.29 (-0.95%)
PAEL 26.35 Decreased By ▼ -0.26 (-0.98%)
PIAA 20.80 Decreased By ▼ -1.69 (-7.51%)
PIBTL 6.68 Increased By ▲ 0.01 (0.15%)
PPL 123.00 Increased By ▲ 0.71 (0.58%)
PRL 26.69 Decreased By ▼ -0.28 (-1.04%)
PTC 14.33 Increased By ▲ 0.42 (3.02%)
SEARL 59.12 Decreased By ▼ -0.75 (-1.25%)
SNGP 69.50 Decreased By ▼ -0.56 (-0.8%)
SSGC 10.33 Decreased By ▼ -0.02 (-0.19%)
TELE 8.50 Decreased By ▼ -0.04 (-0.47%)
TPLP 11.23 Decreased By ▼ -0.11 (-0.97%)
TRG 64.85 Decreased By ▼ -1.15 (-1.74%)
UNITY 26.25 Decreased By ▼ -0.08 (-0.3%)
WTL 1.34 Decreased By ▼ -0.01 (-0.74%)
BR100 7,851 Increased By 26.3 (0.34%)
BR30 25,337 Decreased By -69.2 (-0.27%)
KSE100 75,207 Increased By 122.8 (0.16%)
KSE30 24,143 Increased By 49.1 (0.2%)

Government of Pakistan and Asian Development Bank on Thursday signed a loan and a grant agreement amounting to $284 million (Loan 3677 for $280 million and Grant for $4 million) from ADB''''s Ordinary Capital Resources and High-Level Technology Fund for the Second Power Transmission Enhancement Investment Program- Tranche-3. Noor Ahmed, Secretary, Economic Affairs Division (EAD) signed the Loan Agreement with Xiaohong Yang, Country Director, ADB, says a press release issued here.
The National Transmission and Despatch Company (NTDC) is the implementing agency of the Tranche-3 Project under the existing Multi-tranche Financing Facility amounting to $810 million. Certain components of the investment program will be implemented by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) including certain capacity components, as set out in the legal agreement for each tranche.
The project objective is to attain improved coverage, reliability, transparency and quality of the power transmission service in the project areas. The project shall comprise of the; (i) Construction of 500/220/132 kV Lahore North substation with six 500 kV line bays, six 220 kV line bays, and two 132 kV line bays, including installation of four 750 MVA, 500/220 kV and three 250 MVA, 220/132 kV transformers along with allied equipment and accessories; (ii) installation of approximately 194 km of associated double circuit transmission lines;(iii) construction of 500 kV switching station at Maira with 8 line bays and 4 shunt reactor banks along with allied equipment and ccessories; (iv) construction of the 220 kV substation at Jauharabad with four 220 kV line bays and eight 132 kV line bays, including installation of three 160 MVA, 230/132 kV transformers along with allied equipment and accessories; (v) Installation of lithium-ion battery packs (5 MWh); (vi) installation of balance of system including inverters (20MW).
The impact of Tranche-3 is improved transmission infrastructure and improved energy market transparency whereas the outcome of Tranche-3 is improved coverage reliability, transparency and quality of the power transmission service in Project areas.
The project is expected to be completed by 30th June 2023. The project when completed is expected to address some critical bottlenecks in distribution system of NTDC and will facilitate uninterrupted and reliable supply of electricity of 1150 MW in project area.-PR

Copyright Business Recorder, 2018

Comments

Comments are closed.