AIRLINK 76.15 Increased By ▲ 1.75 (2.35%)
BOP 4.86 Decreased By ▼ -0.09 (-1.82%)
CNERGY 4.31 Decreased By ▼ -0.03 (-0.69%)
DFML 46.65 Increased By ▲ 1.92 (4.29%)
DGKC 89.25 Increased By ▲ 1.98 (2.27%)
FCCL 23.48 Increased By ▲ 0.58 (2.53%)
FFBL 33.36 Increased By ▲ 1.71 (5.4%)
FFL 9.35 Decreased By ▼ -0.01 (-0.11%)
GGL 10.10 No Change ▼ 0.00 (0%)
HASCOL 6.66 Decreased By ▼ -0.11 (-1.62%)
HBL 113.77 Increased By ▲ 0.17 (0.15%)
HUBC 143.90 Increased By ▲ 3.75 (2.68%)
HUMNL 11.85 Decreased By ▼ -0.06 (-0.5%)
KEL 4.99 Increased By ▲ 0.12 (2.46%)
KOSM 4.40 No Change ▼ 0.00 (0%)
MLCF 38.50 Increased By ▲ 0.10 (0.26%)
OGDC 133.70 Increased By ▲ 0.90 (0.68%)
PAEL 25.39 Increased By ▲ 0.94 (3.84%)
PIBTL 6.75 Increased By ▲ 0.22 (3.37%)
PPL 120.01 Increased By ▲ 0.37 (0.31%)
PRL 26.16 Increased By ▲ 0.28 (1.08%)
PTC 13.89 Increased By ▲ 0.14 (1.02%)
SEARL 57.50 Increased By ▲ 0.25 (0.44%)
SNGP 66.30 Decreased By ▼ -0.10 (-0.15%)
SSGC 10.10 Decreased By ▼ -0.05 (-0.49%)
TELE 8.10 Increased By ▲ 0.15 (1.89%)
TPLP 10.61 Decreased By ▼ -0.03 (-0.28%)
TRG 62.80 Increased By ▲ 1.14 (1.85%)
UNITY 26.95 Increased By ▲ 0.32 (1.2%)
WTL 1.34 Decreased By ▼ -0.02 (-1.47%)
BR100 7,958 Increased By 122.7 (1.57%)
BR30 25,727 Increased By 396.8 (1.57%)
KSE100 75,878 Increased By 1000.4 (1.34%)
KSE30 24,343 Increased By 355.2 (1.48%)

The Punjab government has replaced the operative part of the fuel treatment plant for the Nandipur power project in 2014, say power sector experts. They have rejected Federal Minister for Defence, Water and Power Khawaja Mohammad Asif's earlier claim that the fuel treatment plant was purchased by the previous government. "The machinery of the Nandipur power project can never be operational to its full capacity of producing 425 megawatts because of technical faults," he added.
The minister had also claimed that heavy faults were occurred soon after the premier opened the project on May 31, 2014, which was led by procurement of the operative part by the Punjab government. The experts claimed the government of former premier Shaukat Aziz had approved the engineering, procurement and commissioning contract.
The machinery arrived at the Karachi Port in 2010 during the government of the People's Party when former law minister Babar Awan created hurdles in transportation of the machinery to Nandipur in the Punjab. The experts said it was Muhammad Mehmood who had brought it to Nandipur after the ruling party came into power in 2013 and that the government had bestowed on him Sitara-e-Imtiaz for this service.
"The machinery was never checked by engineers before its installation and the faults were detected when the premier had inaugurated it with a big pump and show," the experts said. They went on to say the power project was under the supervision of the GENCO Holding Company of the federal government, but the Punjab government had taken over it on political considerations.

Copyright Business Recorder, 2015

Comments

Comments are closed.