AIRLINK 76.15 Increased By ▲ 1.75 (2.35%)
BOP 4.86 Decreased By ▼ -0.09 (-1.82%)
CNERGY 4.31 Decreased By ▼ -0.03 (-0.69%)
DFML 46.65 Increased By ▲ 1.92 (4.29%)
DGKC 89.25 Increased By ▲ 1.98 (2.27%)
FCCL 23.48 Increased By ▲ 0.58 (2.53%)
FFBL 33.36 Increased By ▲ 1.71 (5.4%)
FFL 9.35 Decreased By ▼ -0.01 (-0.11%)
GGL 10.10 No Change ▼ 0.00 (0%)
HASCOL 6.66 Decreased By ▼ -0.11 (-1.62%)
HBL 113.77 Increased By ▲ 0.17 (0.15%)
HUBC 143.90 Increased By ▲ 3.75 (2.68%)
HUMNL 11.85 Decreased By ▼ -0.06 (-0.5%)
KEL 4.99 Increased By ▲ 0.12 (2.46%)
KOSM 4.40 No Change ▼ 0.00 (0%)
MLCF 38.50 Increased By ▲ 0.10 (0.26%)
OGDC 133.70 Increased By ▲ 0.90 (0.68%)
PAEL 25.39 Increased By ▲ 0.94 (3.84%)
PIBTL 6.75 Increased By ▲ 0.22 (3.37%)
PPL 120.01 Increased By ▲ 0.37 (0.31%)
PRL 26.16 Increased By ▲ 0.28 (1.08%)
PTC 13.89 Increased By ▲ 0.14 (1.02%)
SEARL 57.50 Increased By ▲ 0.25 (0.44%)
SNGP 66.30 Decreased By ▼ -0.10 (-0.15%)
SSGC 10.10 Decreased By ▼ -0.05 (-0.49%)
TELE 8.10 Increased By ▲ 0.15 (1.89%)
TPLP 10.61 Decreased By ▼ -0.03 (-0.28%)
TRG 62.80 Increased By ▲ 1.14 (1.85%)
UNITY 26.95 Increased By ▲ 0.32 (1.2%)
WTL 1.34 Decreased By ▼ -0.02 (-1.47%)
BR100 7,957 Increased By 122.2 (1.56%)
BR30 25,700 Increased By 369.8 (1.46%)
KSE100 75,878 Increased By 1000.4 (1.34%)
KSE30 24,343 Increased By 355.2 (1.48%)

The Karachi Port Trust (KPT) hired consultancy services of state-owned National Engineering Services Pakistan (Pvt) Limited (Nespak) for the reconstruction of two jetties at Manora and Keamari Islands in Karachi. According to the spokesperson of the NESPAK the existing Pilot Pier at Manora is more than 60 years' old and is in a dilapidated condition. NESPAK scope of services includes detailed design, preparation of tender documents and construction supervision.
The proposed jetty will be 30-m long along with a 40-m wide jetty head for mooring of small and large boats up to 100-ft length. The jetty structure will comprise RCC piles, pile caps, deck slab, two landing stairs, fenders, bollards, street lighting, paved blocks and a parking area in the backyard. Currently, NESPAK has completed the design of the jetty and bidding documents will be submitted to the Client soon. Estimated cost of the project is Rs220 million.
The existing Boat Basin Jetty at Keamari is also in a dilapidated condition. The reconstruction of new jetty, which is 240-m long and 6-m wide, will facilitate the fishermen community of Baba and Bhit Islands and the coastguard. Facilities will be provided for embarkation, disembarkation and a driveway for VIP movement along the jetty. An important component of the project is a floating jetty with adjustable gangway for handling cargo. Onshore facilities include waiting rooms, a VIP room, parking shed, toilet block, a gate house, a parking lot and fire-fighting system.

Copyright Business Recorder, 2014

Comments

Comments are closed.