AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)
Top News

PM Abbasi calls meeting over load-shedding crisis in Karachi

Taking notice of the load shedding crisis in Karachi, Prime Minister Shahid Khaqan Abbasi has called a meeting of Ca
Published April 21, 2018

Taking notice of the load shedding crisis in Karachi, Prime Minister Shahid Khaqan Abbasi has called a meeting of Cabinet Committee on Energy on April 23.

According to local media reports, the meeting will be held in Karachi. As the month of Ramazan approaches, the citizens are facing a lot of hardships as load-shedding continues to prevail in Karachi.

Earlier on Friday, political parties, including Pak Sarzameen Party and Jamaat-e-Islami, staged a protest outside Karachi Press Club and K-Electric (KE) head office near Punjab Chowrangi.

On Thursday, the National Electric Power Regulatory Authority hinted at taking over KE and said that it had the authority to take over if the load-shedding issue was not solved immediately.

The KE issued a press release blaming the cause of prolonged load-shedding to low gas supply from Sui Southern Gas Company (SSGC). The release stated that KE is currently receiving gas supply at approximately 90mmcfd as opposed to Economic Coordination Committee (ECC) allocated 276mmcfd and below the supply levels of this time last year.

SSGC immediately replied to their claim terming the statement misleading.

Copyright Business Recorder, 2018

Comments

Comments are closed.