AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

TARBELA: Prime Minister Shahid Khaqan Abbasi Saturday inaugurated 1410 MW Tarbela 4th extension hydropower project. President Azad Jammu & Kashmir Sardar Masood Khan, Governor Khyber Pakhtunkhwa Iqbal Zafar Jhagra, Minister for Water Resources Syed Javed Ali Shah, Minister of State for Information Maryum Aurangzeb and Chinese Ambassador Yao Jing accompanied the Prime Minister.

First unit of 470 MW will be commissioned today, while as two more units each with equal power generating capacity will be online before the advent of summer this year. Commissioning of Tarbela 4th Extension Hydropower Project is yet another historic milestone, achieved by the government to add 1410 MW in the national grid.

The T-4 project will play a pivotal role in balancing energy mix of the country and stabilizing prices of electricity for a long span in future with an attractive economic rate of return of more than 30pc and annual cost sale of US$: 300 million to national exchequer. Completion of this important project within time and cost always held top priority of the government.

It resounds as a real proof of the Government's commitment to provide relief to common man through provision of affordable and clean energy. It will also augment economic growth and social uplift.

Tarbela Dam is located on the Indus River about 100 km northwest of Islamabad. The T-4 project is located within premises of existing Tarbela Dam Project.

Tarbela Dam Project, completed in 1976, has provision of 5 tunnels, 4 on Left Bank and 01 on Right Bank. Tunnels 1-3 have installed capacity of 3,478 MW with average annual energy generation of 15-16 billion units. The T-4 project will generate 3.84 billion units annually, equivalent of burning of 1 million ton of furnace oil. Newly installed units of T-4 project are more efficient and it is expected to have 10 -15% more energy through these units.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.