AIRLINK 73.42 Increased By ▲ 0.62 (0.85%)
BOP 4.99 Decreased By ▼ -0.07 (-1.38%)
CNERGY 4.36 Increased By ▲ 0.03 (0.69%)
DFML 29.79 Decreased By ▼ -0.73 (-2.39%)
DGKC 90.25 Increased By ▲ 4.30 (5%)
FCCL 22.90 Increased By ▲ 0.55 (2.46%)
FFBL 33.70 Increased By ▲ 0.48 (1.44%)
FFL 9.86 Increased By ▲ 0.08 (0.82%)
GGL 10.44 Increased By ▲ 0.04 (0.38%)
HBL 113.49 Decreased By ▼ -0.13 (-0.11%)
HUBC 137.30 Increased By ▲ 1.10 (0.81%)
HUMNL 9.64 Decreased By ▼ -0.39 (-3.89%)
KEL 4.72 Increased By ▲ 0.06 (1.29%)
KOSM 4.81 Increased By ▲ 0.41 (9.32%)
MLCF 39.62 Increased By ▲ 1.27 (3.31%)
OGDC 135.25 Increased By ▲ 1.85 (1.39%)
PAEL 28.57 Increased By ▲ 1.17 (4.27%)
PIAA 24.80 Increased By ▲ 0.04 (0.16%)
PIBTL 6.97 Increased By ▲ 0.42 (6.41%)
PPL 123.20 Increased By ▲ 1.99 (1.64%)
PRL 27.17 Increased By ▲ 0.02 (0.07%)
PTC 14.60 Increased By ▲ 0.71 (5.11%)
SEARL 59.57 Decreased By ▼ -0.83 (-1.37%)
SNGP 69.24 Increased By ▲ 0.71 (1.04%)
SSGC 10.42 Increased By ▲ 0.09 (0.87%)
TELE 9.00 Decreased By ▼ -0.05 (-0.55%)
TPLP 11.59 Increased By ▲ 0.33 (2.93%)
TRG 67.16 Increased By ▲ 1.46 (2.22%)
UNITY 25.25 No Change ▼ 0.00 (0%)
WTL 1.55 Increased By ▲ 0.05 (3.33%)
BR100 7,708 Increased By 74.3 (0.97%)
BR30 25,555 Increased By 383.1 (1.52%)
KSE100 73,266 Increased By 608 (0.84%)
KSE30 23,546 Increased By 163.2 (0.7%)

ISLAMABAD: The entire country is facing hours of load shedding due to massive shortfall in generation owing to frequent tripping in South Punjab and faults in Guddu Thermal Power House.

According to Power Division, due to dense fog, NTDC faced tripping of 500 kV and 220 kV Transmission Lines in the vicinity of Guddu.

“One of the poles of 500 kV Circuit Breaker was damaged but the faulty part was isolated from the healthy system immediately and switch yard was energized,” claims Power Division.

Irregularities in Guddu thermal power station: NAB seeks details of GHCL CEO, others

However, this claim of Power Division is contrary to the on-ground power availability situation, as most parts of the country are facing load shedding of 12 hours or more which implies the country is facing at least 6000 MW shortfall. Hydel generation is also at its low ebb due to annual canal closure which will continue till end of current month.

Power Division maintains that the damaged part is being replaced with a healthy one, and work is being completed on a war footing. It further states that investigation is also under way to check the root cause behind damage of pole of circuit breaker of Guddu switch yard.

Copyright Business Recorder, 2024

Comments

Comments are closed.

Twain pen di Jan 02, 2024 05:40am
all year round something is always damaged in the electricity infrastructure, the only repair required is to their brains.
thumb_up Recommended (0)