BR100 Decreased By (-0.15%)
BR30 Decreased By (-0.74%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.80 Decreased By ▼ -0.23 (-3.81%)
BML 58.03 Increased By ▲ 5.28 (10.01%)
BOP 33.85 Decreased By ▼ -0.40 (-1.17%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.77 Decreased By ▼ -0.57 (-4.62%)
FCCL 53.35 Decreased By ▼ -0.54 (-1%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.89 Decreased By ▼ -0.14 (-0.78%)
FNEL 1.31 Increased By ▲ 0.01 (0.77%)
HUMNL 11.06 Increased By ▲ 0.06 (0.55%)
KEL 8.05 Decreased By ▼ -0.06 (-0.74%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.19 Decreased By ▼ -0.86 (-0.98%)
NBP 184.60 Decreased By ▼ -1.88 (-1.01%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.31 Increased By ▲ 0.37 (0.93%)
PIAHCLA 26.10 Decreased By ▼ -0.07 (-0.27%)
PIBTL 17.09 Decreased By ▼ -0.23 (-1.33%)
PPL 228.40 Decreased By ▼ -4.38 (-1.88%)
PRL 34.59 Decreased By ▼ -0.36 (-1.03%)
PTC 67.35 Decreased By ▼ -0.21 (-0.31%)
SEARL 91.00 Increased By ▲ 0.07 (0.08%)
SSGC 26.90 Decreased By ▼ -0.27 (-0.99%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.29 Increased By ▲ 0.53 (6.05%)
TREET 24.59 Increased By ▲ 0.05 (0.2%)
TRG 71.69 Decreased By ▼ -0.06 (-0.08%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
By

LUCKNOW: Rescuers were able to make contact on Monday with 40 labourers trapped in a collapsed tunnel in the Himalayan state of Uttarakhand and were hopeful they would be rescued soon, an official said.

The tunnel, which was being constructed on a national highway that is part of a Hindu pilgrimage route, collapsed early Sunday morning.

“Rescue workers are preparing an escape passage by drilling the debris,” local police superintendent Arpan Yaduvanshi told Reuters on phone.

“Food and water was supplied to the labourers and we are hopeful that the rescue operation will be completed soon.

Everyone inside, about 40 labourers, is fit,“ the police officer said.

At least 40 Indian workers trapped in tunnel collapse: rescue worker

Uttarakhand in north India is vulnerable to landslides, earthquake and floods. The Char Dham pilgrimage project is one of the most ambitious projects of Prime Minister Narendra Modi’s government.

It aims to connect four important Hindu pilgrimage sites of North India through 889 kilometres (552 miles) of two-lane road being constructed at a cost of $1.5 billion.

Comments

Comments are closed for this article.