AIRLINK 76.15 Increased By ▲ 1.75 (2.35%)
BOP 4.86 Decreased By ▼ -0.09 (-1.82%)
CNERGY 4.31 Decreased By ▼ -0.03 (-0.69%)
DFML 46.65 Increased By ▲ 1.92 (4.29%)
DGKC 89.25 Increased By ▲ 1.98 (2.27%)
FCCL 23.48 Increased By ▲ 0.58 (2.53%)
FFBL 33.36 Increased By ▲ 1.71 (5.4%)
FFL 9.35 Decreased By ▼ -0.01 (-0.11%)
GGL 10.10 No Change ▼ 0.00 (0%)
HASCOL 6.66 Decreased By ▼ -0.11 (-1.62%)
HBL 113.77 Increased By ▲ 0.17 (0.15%)
HUBC 143.90 Increased By ▲ 3.75 (2.68%)
HUMNL 11.85 Decreased By ▼ -0.06 (-0.5%)
KEL 4.99 Increased By ▲ 0.12 (2.46%)
KOSM 4.40 No Change ▼ 0.00 (0%)
MLCF 38.50 Increased By ▲ 0.10 (0.26%)
OGDC 133.70 Increased By ▲ 0.90 (0.68%)
PAEL 25.39 Increased By ▲ 0.94 (3.84%)
PIBTL 6.75 Increased By ▲ 0.22 (3.37%)
PPL 120.01 Increased By ▲ 0.37 (0.31%)
PRL 26.16 Increased By ▲ 0.28 (1.08%)
PTC 13.89 Increased By ▲ 0.14 (1.02%)
SEARL 57.50 Increased By ▲ 0.25 (0.44%)
SNGP 66.30 Decreased By ▼ -0.10 (-0.15%)
SSGC 10.10 Decreased By ▼ -0.05 (-0.49%)
TELE 8.10 Increased By ▲ 0.15 (1.89%)
TPLP 10.61 Decreased By ▼ -0.03 (-0.28%)
TRG 62.80 Increased By ▲ 1.14 (1.85%)
UNITY 26.95 Increased By ▲ 0.32 (1.2%)
WTL 1.34 Decreased By ▼ -0.02 (-1.47%)
BR100 7,957 Increased By 122.2 (1.56%)
BR30 25,700 Increased By 369.8 (1.46%)
KSE100 75,878 Increased By 1000.4 (1.34%)
KSE30 24,343 Increased By 355.2 (1.48%)

ISLAMABAD: A study conducted and published by Institute of Policy Studies (IPS) titled 'Barriers and Drivers of Solar Prosumage: A Case-Study of Pakistan' states that as of November 2020, net-metering installations in Pakistan have reached a cumulative capacity of 148MW, which contrasts very poorly in comparison with other peer regional countries such as India where distributed generation has exceeded 5GW of installed capacity.

The study further observes that strong geographic uneven growth exists across the DISCOs in terms of distributed generation uptake where around 70 percent of growth is concentrated in three major utilities namely IESCO, LESCO and KEL.

Overall, the challenges at inter-connection phase were identified as the dominant challenge to PV (photo-voltaic system) development, which included time lapse in acquiring of three-phase metering equipment at the initial stage, absence of online facility for applications, unavailability of bi-directional meters, and unnecessary delay in processing of the applications at every stage. The cumbersome procedure makes it quite challenging to get the generation license.

Further, since DISCOs are playing the primary intermediary in this entire process-playing the role of coordinator between distributed resources-they continue to be reluctant towards distributed generation growth owing to administrative burden of processing applications, perceived fears of revenue losses and integration challenges, etc. Although they are obliged by law to implement the net-metering regulations however currently no accountability mechanism exists which could bind them to do the same.

The report also observes skewed concentration of distributed generation in resourceful sections of society. This skewed concentration is indicated to be rooted in 'high cost of solar PV installation' and the interlinked challenge of 'difficulty in access to borrowing' for financing the solar PV system. And while State Bank of Pakistan has introduced a scheme for supporting rooftop solar yet its limited adoption by commercial banks continue to restrict borrowing for these installations. In parallel, absence of Fee of Service Models-such as third party investors-again contribute to slow diffusion of solar PV among larger sections of society.

Copyright Business Recorder, 2021

Comments

Comments are closed.