AIRLINK 72.80 Increased By ▲ 0.62 (0.86%)
BOP 5.06 Increased By ▲ 0.13 (2.64%)
CNERGY 4.33 Decreased By ▼ -0.02 (-0.46%)
DFML 30.52 Increased By ▲ 2.03 (7.13%)
DGKC 85.95 Increased By ▲ 4.65 (5.72%)
FCCL 22.35 Increased By ▲ 0.85 (3.95%)
FFBL 33.22 Increased By ▲ 0.17 (0.51%)
FFL 9.78 Decreased By ▼ -0.08 (-0.81%)
GGL 10.40 Decreased By ▼ -0.08 (-0.76%)
HBL 113.62 Decreased By ▼ -0.38 (-0.33%)
HUBC 136.20 Decreased By ▼ -3.80 (-2.71%)
HUMNL 10.03 Increased By ▲ 1.00 (11.07%)
KEL 4.66 Decreased By ▼ -0.07 (-1.48%)
KOSM 4.40 Increased By ▲ 0.02 (0.46%)
MLCF 38.35 Increased By ▲ 0.70 (1.86%)
OGDC 133.40 Decreased By ▼ -0.30 (-0.22%)
PAEL 27.40 Increased By ▲ 1.80 (7.03%)
PIAA 24.76 Increased By ▲ 0.78 (3.25%)
PIBTL 6.55 Increased By ▲ 0.07 (1.08%)
PPL 121.21 Decreased By ▼ -1.41 (-1.15%)
PRL 27.15 Increased By ▲ 0.08 (0.3%)
PTC 13.89 Increased By ▲ 0.29 (2.13%)
SEARL 60.40 Increased By ▲ 3.78 (6.68%)
SNGP 68.53 Decreased By ▼ -0.71 (-1.03%)
SSGC 10.33 Decreased By ▼ -0.01 (-0.1%)
TELE 9.05 Increased By ▲ 0.60 (7.1%)
TPLP 11.26 Decreased By ▼ -0.02 (-0.18%)
TRG 65.70 Increased By ▲ 4.49 (7.34%)
UNITY 25.25 Decreased By ▼ -0.08 (-0.32%)
WTL 1.50 No Change ▼ 0.00 (0%)
BR100 7,608 Decreased By -22.2 (-0.29%)
BR30 25,091 Increased By 100.6 (0.4%)
KSE100 72,658 Increased By 56.2 (0.08%)
KSE30 23,383 Decreased By -155.9 (-0.66%)

A stretch of the Ohio River that has become a choke point reopened on August 16 after water levels rose, but a second dredging vessel was on its way to more permanently deepen the navigation channel, US Coast Guard officials said.
Vessels towing barges have been waiting since noon Friday to pass through the Ohio River near where it meets the Mississippi River at Cairo, Illinois.
The Coast Guard let 10 southbound vessels through on Tuesday with another 30 waiting, said Denise Matthews, commanding officer of the Coast Guard Marine Safety Unit at Paducah, Kentucky. At sunset, the Coast Guard will switch to clearing a backlog of 16 northbound vessels.
The Coast Guard will resume letting southbound traffic through the stretch being dredged on Wednesday morning.
The US Army Corps of Engineers had dredged 1,200 feet of a 3,900-foot section as of 1 pm CDT (1800 GMT), Matthews said. Another dredging vessel was expected to arrive by midnight Tuesday and begin working at the opposite end of the section.
The Army Corps will dredge four areas between Mound City and Cairo, Illinois, during the next two weeks.

Copyright Reuters, 2005

Comments

Comments are closed.