AIRLINK 74.95 Decreased By ▼ -0.48 (-0.64%)
BOP 5.11 Increased By ▲ 0.04 (0.79%)
CNERGY 4.62 Decreased By ▼ -0.13 (-2.74%)
DFML 29.75 Decreased By ▼ -0.35 (-1.16%)
DGKC 87.96 Decreased By ▼ -2.52 (-2.79%)
FCCL 22.35 Decreased By ▼ -0.55 (-2.4%)
FFBL 32.94 Decreased By ▼ -0.01 (-0.03%)
FFL 10.02 Decreased By ▼ -0.03 (-0.3%)
GGL 11.05 Decreased By ▼ -0.29 (-2.56%)
HBL 114.12 Increased By ▲ 0.63 (0.56%)
HUBC 136.82 Increased By ▲ 0.31 (0.23%)
HUMNL 9.39 Decreased By ▼ -0.51 (-5.15%)
KEL 4.61 Decreased By ▼ -0.05 (-1.07%)
KOSM 4.63 Decreased By ▼ -0.06 (-1.28%)
MLCF 40.17 Decreased By ▼ -0.93 (-2.26%)
OGDC 135.48 Increased By ▲ 0.68 (0.5%)
PAEL 26.95 Decreased By ▼ -0.66 (-2.39%)
PIAA 24.35 Decreased By ▼ -1.12 (-4.4%)
PIBTL 6.90 Decreased By ▼ -0.02 (-0.29%)
PPL 124.33 Decreased By ▼ -0.12 (-0.1%)
PRL 27.25 Decreased By ▼ -0.15 (-0.55%)
PTC 14.15 Decreased By ▼ -0.35 (-2.41%)
SEARL 60.65 Increased By ▲ 0.45 (0.75%)
SNGP 71.10 Increased By ▲ 0.55 (0.78%)
SSGC 10.50 Decreased By ▼ -0.06 (-0.57%)
TELE 8.71 Decreased By ▼ -0.18 (-2.02%)
TPLP 11.66 Decreased By ▼ -0.12 (-1.02%)
TRG 66.65 Decreased By ▼ -1.01 (-1.49%)
UNITY 25.22 Increased By ▲ 0.05 (0.2%)
WTL 1.45 Decreased By ▼ -0.03 (-2.03%)
BR100 7,734 Increased By 9.2 (0.12%)
BR30 25,503 Decreased By -97.8 (-0.38%)
KSE100 74,046 Increased By 246.7 (0.33%)
KSE30 23,785 Increased By 161.3 (0.68%)

imageFRANKFURT: The following table lists planned outages and load reductions at German nuclear power plants.

It gives dates for previous outages, plants returning online and planned shutdowns. Sources are operators' websites and the EEX exchange's transparency website.

The maximum national capacity has gone down to 11,357 MW from previously 12,696 MW, after E.ON took Grafenrheinfeld permanently offline in 2015.

Germany took the axe to the bulk of its nuclear capacity in the summer of 2011, switching off the seven oldest blocks plus Vattenfall's Kruemmel permanently after the Japan nuclear crisis earlier that year raised safety concerns.

German policymakers agreed to leave the 8,821 MW represented by the eight blocks offline when a three-month moratorium expired at the end of June 2011.

Before the Fukushima crisis, German nuclear capacity had amounted to around 21,500 MW.

The policy switch in 2011 reversed longer nuclear life cycles that had been granted to the remaining nuclear power stations in the autumn of 2010. It also sped up the timetable for closure of all remaining capacity by 2022.

With Grohnde back online, reactor capacity is at near totals, safe for the below mentioned partial load drops.

Copyright Reuters, 2016

Comments

Comments are closed.