AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

imageISLAMABAD: The major portion of the China- Pakistan Economic Corridor (CPEC) transportation infrastructure projects' investment would go to Khyber Pakhtunkhwa, wherein as many as $3.825 billion would be spent on development of various infrastructure projects.

As many as $ 3.020 billion would be spent on the major portion of Karokaram Highway Phase-II (from Raikot to Islamabad), followed by an investment of $ 730 million on construction of a portion of expansion and reconstruction of existing main railway line ML-1, official sources said.

A sum of $ 35 million would be spent on major portion of Cross-border Optical Fiber Cable while $ 40 million would be spent on establishment of Havelian Dry Port.

The next major beneficiary of the CPEC infrastructure would be Punjab provinces, wherein $ 3.739 billion would be utilized for various projects.

A sum of $ 1.790 billion would be spent for construction of a portion of Sukkur-Multan of Peshawar-Karachi Motorway while $ 1.460 billion have been estimated cost of a portion of expansion and reconstruction of existing main railway line (ML-1).

Similarly, $ 480 million would be utilized for construction of small portion of Railkot-Islamabad Highway and $ 9 million for Cross Border Optical fiber Cable.

In Sindh, $ 2.260 million would be utilized for transport infrastructure projects, out of which $ 1.460 billion would be spent on expansion and reconstruction of a portion of existing Line ML-1.

An amount of $ 800 million would be spent on construction of a portion of Sukkur-Multan Section of Karachi Lahore Motorway (KLM).

About $ 793 million would be spent on 8 transport infrastructure projects of Balochistan province.

As many as $ 130 million would be spent on necessary facility of fresh water treatment and supply, $ 100 million for establishment of a hospital at Gwadar, $ 230 million for construction of Gawadar International Airport and $ 141 million for establishment of Eastbay Expressway.

Similarly, $ 123 million would be spent on construction of breakwaters, $ 27 million for dredging of berthing areas and channels, $ 32 million for infrastructure for Free Zone and EPZs-port related industries and $ 10 million for technical and vocational institute at Gwadar.

It is pertinent to mention here that CPEC is a long-term broad framework with multiple sectoral projects, which will be completed in different phases through bilateral agreements agreed upon by both sides as a win-win equation.

Pakistan and China had signed an agreement last year to commence work on CPEC development projects worth over $46 billion.

The corridor aims to connect Gwadar port in Balochistan to China's Xinjiang region via a network of highways, railways and pipelines spread over 3,000 KM. Work on several sections is in progress.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.