AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

imageISLAMABAD: The development work in Capital Development Authority's (CDA) unique Park Enclave housing project is at full swing while CDA has also sought applications for balloting of residential plots.

The plots measuring one and two kanals, will be allotted through balloting process and advertisement in this context has already been floated in the newspapers so that people can own their houses in this unique housing project.

A high level meeting, chaired by Chairman CDA Maroof Afzal, was held at CDA headquarters to review the progress of development work at Park Enclave Housing Project.

While expressing his satisfaction over on-going development work, Chairman CDA directed the concerned formations to complete development work within stipulated time without compromising the quality of work.

He further directed to submit a detailed progress report on the development work on daily basis. Chairman CDA directed the project director to ensure quality and timely completion of development work in Park Enclave Housing Project.

The development work in Park Enclave Housing Project would cost approximately Rs.1.24 billion, which includes construction of major roads, service roads, streets, footpaths, drainage system, water supply lines with complete water supply system, sewerage system, construction of bridges and culverts and electrification work, while the boundary wall of the Park Enclave has already been completed.

Copyright APP (Associated Press of Pakistan), 2014

Comments

Comments are closed.