AIRLINK 75.20 Decreased By ▼ -4.80 (-6%)
BOP 5.18 No Change ▼ 0.00 (0%)
CNERGY 4.46 No Change ▼ 0.00 (0%)
DFML 35.02 Decreased By ▼ -0.14 (-0.4%)
DGKC 77.36 Increased By ▲ 0.48 (0.62%)
FCCL 20.15 Increased By ▲ 0.17 (0.85%)
FFBL 37.11 Increased By ▲ 1.51 (4.24%)
FFL 9.55 Increased By ▲ 0.02 (0.21%)
GGL 10.00 Decreased By ▼ -0.16 (-1.57%)
HBL 117.00 No Change ▼ 0.00 (0%)
HUBC 133.00 Increased By ▲ 0.50 (0.38%)
HUMNL 7.05 Decreased By ▼ -0.01 (-0.14%)
KEL 4.58 Decreased By ▼ -0.07 (-1.51%)
KOSM 4.53 Decreased By ▼ -0.12 (-2.58%)
MLCF 37.10 Decreased By ▼ -0.40 (-1.07%)
OGDC 136.68 Increased By ▲ 2.21 (1.64%)
PAEL 23.34 Increased By ▲ 0.44 (1.92%)
PIAA 26.80 Increased By ▲ 0.17 (0.64%)
PIBTL 6.80 Decreased By ▼ -0.01 (-0.15%)
PPL 117.85 Increased By ▲ 5.75 (5.13%)
PRL 27.63 Increased By ▲ 0.43 (1.58%)
PTC 14.42 Increased By ▲ 0.04 (0.28%)
SEARL 56.12 Decreased By ▼ -0.27 (-0.48%)
SNGP 68.35 Increased By ▲ 1.35 (2.01%)
SSGC 10.84 Increased By ▲ 0.01 (0.09%)
TELE 9.19 Decreased By ▼ -0.10 (-1.08%)
TPLP 11.02 Decreased By ▼ -0.16 (-1.43%)
TRG 67.30 Decreased By ▼ -1.70 (-2.46%)
UNITY 25.30 Decreased By ▼ -0.19 (-0.75%)
WTL 1.32 No Change ▼ 0.00 (0%)
BR100 7,581 Increased By 59.6 (0.79%)
BR30 24,688 Increased By 285.9 (1.17%)
KSE100 72,072 Increased By 377.3 (0.53%)
KSE30 23,699 Increased By 156.9 (0.67%)

ISLAMABAD: M/s Engro has claimed that it had been in discussion with concerned stakeholders on dry docking since October 2019.

The company says that government-to-government LNG agreement requires LNG to be delivered in LNG carriers at Port Qasim and limits any other vessel to bring cargoes on FOB basis. Therefore, the original plan to bring a filled FSRU had to be changed, which also increased complexity of the dry-docking activity. Despite this challenge, EETL and Excelerate Energy met the shutdown dates by managing the channel movement of FSRU Excelerate Sequoia to keep it in a cooled state. The closure time could not have been shortened further as fully optimized switch over also requires 2 to 3 days.

Since its commissioning, EETL has delivered essentially non-stop operations and remained near full utilization. Therefore, there is no seasonality impact of gas supplies from the facility and LNG demand will have to be managed regardless of summer or winter months, in case the terminal goes offline for planned maintenance.

EETL had been in discussion about dry docking with SSGC and all relevant government stakeholders since October 2019. It notified them about updates on dry docking on March 30, 2021, after a survey report issued by the Class Society – responsible to maintain overseas certifications of FSRU under international laws - made it clear that FSRU Exquisite must be sent for dry docking latest by June 30, 2021.

The Class Society had already extended the certifications twice due to COVID-induced disruptions that led to port shutdowns and unavailability of experts. Excelerate, the US firm that owns FSRU Exquisite, had also confirmed that the vessel could not be operated without Class Society certifications beyond the end of June.

Since the March notification, EETL had sought the flexibility and cooperation of stakeholders to find the right window for dry docking activity. However, as the deadlock persisted for over 3 months and confirmed window for the activity could not be determined before June 30, the company added.

Copyright Business Recorder, 2021

Comments

Comments are closed.