AIRLINK 76.39 Decreased By ▼ -3.61 (-4.51%)
BOP 5.21 Increased By ▲ 0.03 (0.58%)
CNERGY 4.48 Increased By ▲ 0.02 (0.45%)
DFML 35.40 Increased By ▲ 0.24 (0.68%)
DGKC 77.47 Increased By ▲ 0.59 (0.77%)
FCCL 20.20 Increased By ▲ 0.22 (1.1%)
FFBL 36.38 Increased By ▲ 0.78 (2.19%)
FFL 9.59 Increased By ▲ 0.06 (0.63%)
GGL 10.04 Decreased By ▼ -0.12 (-1.18%)
HBL 116.91 Decreased By ▼ -0.09 (-0.08%)
HUBC 132.55 Increased By ▲ 0.05 (0.04%)
HUMNL 7.01 Decreased By ▼ -0.05 (-0.71%)
KEL 4.60 Decreased By ▼ -0.05 (-1.08%)
KOSM 4.58 Decreased By ▼ -0.07 (-1.51%)
MLCF 37.18 Decreased By ▼ -0.32 (-0.85%)
OGDC 133.90 Decreased By ▼ -0.57 (-0.42%)
PAEL 23.03 Increased By ▲ 0.13 (0.57%)
PIAA 26.60 Decreased By ▼ -0.03 (-0.11%)
PIBTL 6.71 Decreased By ▼ -0.10 (-1.47%)
PPL 111.85 Decreased By ▼ -0.25 (-0.22%)
PRL 27.73 Increased By ▲ 0.53 (1.95%)
PTC 14.46 Increased By ▲ 0.08 (0.56%)
SEARL 56.10 Decreased By ▼ -0.29 (-0.51%)
SNGP 68.74 Increased By ▲ 1.74 (2.6%)
SSGC 10.82 Decreased By ▼ -0.01 (-0.09%)
TELE 9.20 Decreased By ▼ -0.09 (-0.97%)
TPLP 10.88 Decreased By ▼ -0.30 (-2.68%)
TRG 67.50 Decreased By ▼ -1.50 (-2.17%)
UNITY 25.32 Decreased By ▼ -0.17 (-0.67%)
WTL 1.32 No Change ▼ 0.00 (0%)
BR100 7,537 Increased By 14.6 (0.19%)
BR30 24,387 Decreased By -15.2 (-0.06%)
KSE100 71,804 Increased By 108.9 (0.15%)
KSE30 23,597 Increased By 55.1 (0.23%)
Pakistan

Construction work begins on CPEC’s Karot Hydropower Project

The construction of Karot Hydropower Project, a priority project under the China-Pakistan Economic Corridor (CPEC)
Published September 25, 2018

The construction of Karot Hydropower Project, a priority project under the China-Pakistan Economic Corridor (CPEC) initiative, has officially started.

The construction begins after the Jhelum River, on which the station is being constructed, was closed days ago. The Karot Hydropower Project is located in the Karot area of Punjab and is the fourth level of the Jhelum River Cascade Hydropower Project.

According to People’s Daily, a Chinese daily, the Jhelum River, being a tributary of the Indus River with a vertical fall of about 766 yards, which runs through India and Pakistan, will provide huge resources for the hydropower station.

As per the report, the Karot Hydropower Project is the first hydropower station constructed by Chinese enterprises with Chinese techniques following Chinese standards. The project will generate clean power of 3.2 billion kW-hours each year after it is completed, which is equivalent to 10 percent of the total hydroelectric power of Pakistan in 2017.

The power output is enough to supply power to over two million Pakistani households and is expected to begin operation in 2021.

With a total investment of about $1.74 billion, the Karot Hydropower Project is built, owned, operated and handed over as an investment model. After the 30-year operation period, it will be transferred to the Pakistani government free of charge.

Copyright Business Recorder, 2018

Comments

Comments are closed.