AIRLINK 72.59 Increased By ▲ 3.39 (4.9%)
BOP 4.99 Increased By ▲ 0.09 (1.84%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.71 Increased By ▲ 0.46 (1.47%)
DGKC 80.90 Increased By ▲ 3.65 (4.72%)
FCCL 21.42 Increased By ▲ 1.42 (7.1%)
FFBL 35.19 Increased By ▲ 0.19 (0.54%)
FFL 9.33 Increased By ▲ 0.21 (2.3%)
GGL 9.82 Increased By ▲ 0.02 (0.2%)
HBL 112.40 Decreased By ▼ -0.36 (-0.32%)
HUBC 136.50 Increased By ▲ 3.46 (2.6%)
HUMNL 7.14 Increased By ▲ 0.19 (2.73%)
KEL 4.35 Increased By ▲ 0.12 (2.84%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 37.67 Increased By ▲ 1.07 (2.92%)
OGDC 137.75 Increased By ▲ 4.88 (3.67%)
PAEL 23.41 Increased By ▲ 0.77 (3.4%)
PIAA 24.55 Increased By ▲ 0.35 (1.45%)
PIBTL 6.63 Increased By ▲ 0.17 (2.63%)
PPL 125.05 Increased By ▲ 8.75 (7.52%)
PRL 26.99 Increased By ▲ 1.09 (4.21%)
PTC 13.32 Increased By ▲ 0.24 (1.83%)
SEARL 52.70 Increased By ▲ 0.70 (1.35%)
SNGP 70.80 Increased By ▲ 3.20 (4.73%)
SSGC 10.54 No Change ▼ 0.00 (0%)
TELE 8.33 Increased By ▲ 0.05 (0.6%)
TPLP 10.95 Increased By ▲ 0.15 (1.39%)
TRG 60.60 Increased By ▲ 1.31 (2.21%)
UNITY 25.10 Decreased By ▼ -0.03 (-0.12%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,546 Increased By 137.4 (1.85%)
BR30 24,809 Increased By 772.4 (3.21%)
KSE100 71,902 Increased By 1235.2 (1.75%)
KSE30 23,595 Increased By 371 (1.6%)

ISLAMABAD: The federal government has allocated Rs40,000 million for the various ongoing and new schemes of Railways Division for the financial years 2018-19 under the Public Sector Development Programme (PSDP).

The allocation include Rs 27753.983 million for 29 ongoing projects and Rs 12246.017 million for 10 new schemes, according to budgetary document issued here on Friday.

For the ongoing schemes, an amount of Rs7000 million has earmarked for procurement and manufacturing of 75 diesel electric locomotives of different horse power.

An amount of Rs3569.934 million has been reserved for preliminary design study of upgradation and rehabilitation of Mainline-1 (ML-1) and construction of new dry port and cargo handling facility at Havelian (Buldher), District Haripur.

Similarly, an amount of Rs3000 million has been earmarked for procurement and manufacturing of 820 high capacity of bogies freight wagons and 230 passenger coaches.

An amount of Rs2000 million has been set aside for reconstruction and rehabilitation of assets damaged during 2010 flood, while Rs1704.557 million earmarked for rehabilitation of assets during the riots of December 27-28 2007.

For the new schemes an amount of Rs5000 million has been reserved for upgradation of Pakistan Railways’ existing Mainline-1 (ML-1) and establishment of Dry Port near Havelian (2018-22) Phase-1, under China-Pak Economic Corridor (CPEC).

An amount of Rs4546 million has been reserved for acquisition of land for Railway Corridor from Sea Port Km: 5.25 to Km 9.00 and Railway operational land from: 12.00 to Km: 14.00 at Gwadar.

 

Copyright APP (Associated Press of Pakistan), 2018
 

 

 

 

Comments

Comments are closed.