AIRLINK 74.00 Decreased By ▼ -0.56 (-0.75%)
BOP 5.02 Decreased By ▼ -0.04 (-0.79%)
CNERGY 4.42 Decreased By ▼ -0.04 (-0.9%)
DFML 39.20 Decreased By ▼ -0.53 (-1.33%)
DGKC 86.09 Decreased By ▼ -1.46 (-1.67%)
FCCL 21.65 Decreased By ▼ -0.28 (-1.28%)
FFBL 34.01 Decreased By ▼ -0.58 (-1.68%)
FFL 9.92 Increased By ▲ 0.17 (1.74%)
GGL 10.56 Increased By ▲ 0.07 (0.67%)
HBL 113.89 Increased By ▲ 0.10 (0.09%)
HUBC 135.84 Decreased By ▼ -0.68 (-0.5%)
HUMNL 11.90 Increased By ▲ 1.00 (9.17%)
KEL 4.84 Increased By ▲ 0.17 (3.64%)
KOSM 4.53 Decreased By ▼ -0.11 (-2.37%)
MLCF 38.27 Decreased By ▼ -0.19 (-0.49%)
OGDC 134.85 Decreased By ▼ -1.29 (-0.95%)
PAEL 26.35 Decreased By ▼ -0.26 (-0.98%)
PIAA 20.80 Decreased By ▼ -1.69 (-7.51%)
PIBTL 6.68 Increased By ▲ 0.01 (0.15%)
PPL 123.00 Increased By ▲ 0.71 (0.58%)
PRL 26.69 Decreased By ▼ -0.28 (-1.04%)
PTC 14.33 Increased By ▲ 0.42 (3.02%)
SEARL 59.12 Decreased By ▼ -0.75 (-1.25%)
SNGP 69.50 Decreased By ▼ -0.56 (-0.8%)
SSGC 10.33 Decreased By ▼ -0.02 (-0.19%)
TELE 8.50 Decreased By ▼ -0.04 (-0.47%)
TPLP 11.23 Decreased By ▼ -0.11 (-0.97%)
TRG 64.85 Decreased By ▼ -1.15 (-1.74%)
UNITY 26.25 Decreased By ▼ -0.08 (-0.3%)
WTL 1.34 Decreased By ▼ -0.01 (-0.74%)
BR100 7,842 Increased By 18 (0.23%)
BR30 25,326 Decreased By -79.9 (-0.31%)
KSE100 75,207 Increased By 122.8 (0.16%)
KSE30 24,143 Increased By 49.1 (0.2%)
Pakistan

Power shortfall reaches 5000 MW

ISLAMABAD : The power shortfall has reached 5000 again due to wrong policies of the government. The duration of loads
Published July 12, 2011

 ISLAMABAD: The power shortfall has reached 5000 again due to wrong policies of the government.

The duration of loadshedding in Karachi has reached 15 hours. Currently, electricity demand in the country is 17904 megawatts while the electricity production has been reduced to 12995 megawatts, private news channel reported.

The hydral power generation capacity in the country is 6510 megawatts but the production is 5141 megawatts.

The power generation capacity of IPPs is 7000 megawatts while the production is 5800 megawatts.

Meanwhile, 1941 megawatts of electricity is produced from Gencos despite a generation capacity of 2500 megawatts.

Moreover, 710 megawatt electricity is also provided to KESC.

 

Copyright APP (Associated Press of Pakistan), 2011

 

Comments

Comments are closed.