AIRLINK 75.25 Decreased By ▼ -0.18 (-0.24%)
BOP 5.11 Increased By ▲ 0.04 (0.79%)
CNERGY 4.60 Decreased By ▼ -0.15 (-3.16%)
DFML 32.53 Increased By ▲ 2.43 (8.07%)
DGKC 90.35 Decreased By ▼ -0.13 (-0.14%)
FCCL 22.98 Increased By ▲ 0.08 (0.35%)
FFBL 33.57 Increased By ▲ 0.62 (1.88%)
FFL 10.04 Decreased By ▼ -0.01 (-0.1%)
GGL 11.05 Decreased By ▼ -0.29 (-2.56%)
HBL 114.90 Increased By ▲ 1.41 (1.24%)
HUBC 137.34 Increased By ▲ 0.83 (0.61%)
HUMNL 9.53 Decreased By ▼ -0.37 (-3.74%)
KEL 4.66 No Change ▼ 0.00 (0%)
KOSM 4.70 Increased By ▲ 0.01 (0.21%)
MLCF 40.54 Decreased By ▼ -0.56 (-1.36%)
OGDC 139.75 Increased By ▲ 4.95 (3.67%)
PAEL 27.65 Increased By ▲ 0.04 (0.14%)
PIAA 24.40 Decreased By ▼ -1.07 (-4.2%)
PIBTL 6.92 No Change ▼ 0.00 (0%)
PPL 125.30 Increased By ▲ 0.85 (0.68%)
PRL 27.55 Increased By ▲ 0.15 (0.55%)
PTC 14.15 Decreased By ▼ -0.35 (-2.41%)
SEARL 61.85 Increased By ▲ 1.65 (2.74%)
SNGP 72.98 Increased By ▲ 2.43 (3.44%)
SSGC 10.59 Increased By ▲ 0.03 (0.28%)
TELE 8.78 Decreased By ▼ -0.11 (-1.24%)
TPLP 11.73 Decreased By ▼ -0.05 (-0.42%)
TRG 66.60 Decreased By ▼ -1.06 (-1.57%)
UNITY 25.15 Decreased By ▼ -0.02 (-0.08%)
WTL 1.44 Decreased By ▼ -0.04 (-2.7%)
BR100 7,806 Increased By 81.8 (1.06%)
BR30 25,828 Increased By 227.1 (0.89%)
KSE100 74,531 Increased By 732.1 (0.99%)
KSE30 23,954 Increased By 330.7 (1.4%)

National Engineering Services Pakistan (NESPAK) Private Limited has won project design, construction supervision and implementation support of the ADB-funded Balochistan Water Resources Development Sector Project (BWRDSP) through national competitive bidding; this was stated by Dr. Tahir Masood, Managing Director NESPAK here on Wednesday.

The project will support implementation of integrated water resources management policy of the Government of Balochistan. The policy provides a comprehensive framework for the province to address the issues of water management and development in the context of basin approach, with water harvesting, and groundwater recharging as an integral part of watershed management. The proposed project will address the issues of water management and will enhance agricultural production by construction of a dam (Siri Toi Dam) and rehabilitation/extension of 10 irrigation schemes in Zhob and Mula river basins.

The proposed project will construct and improve irrigation land of about 16,592 hectares and benefit about 42,900 farmers in the Balochistan province. The duration of the project is five years.

Meanwhile, a NESPAK-8.2 OZI JV was awarded NTDC's contract for "Solar Water Pumping in Balochistan - A Feasibility Study." As an initiative towards energy and agricultural sectors reforms in Balochistan, NTDC on behalf of Ministry of Energy (Power Division) has entrusted NESPAK led JV with the task to conduct a comprehensive feasibility study for Solarization of 10,000 tube wells located in various Districts of Balochistan. The 5-month study will encompass a number of issues related to Balochistan endangering the sustainability of its eco-system.

Copyright Business Recorder, 2019

Comments

Comments are closed.