AIRLINK 73.85 Decreased By ▼ -0.15 (-0.2%)
BOP 5.00 Decreased By ▼ -0.02 (-0.4%)
CNERGY 4.48 Increased By ▲ 0.06 (1.36%)
DFML 39.98 Increased By ▲ 0.78 (1.99%)
DGKC 86.20 Increased By ▲ 0.11 (0.13%)
FCCL 21.66 Increased By ▲ 0.01 (0.05%)
FFBL 34.40 Increased By ▲ 0.39 (1.15%)
FFL 9.88 Decreased By ▼ -0.04 (-0.4%)
GGL 10.77 Increased By ▲ 0.21 (1.99%)
HBL 114.15 Increased By ▲ 0.26 (0.23%)
HUBC 136.00 Increased By ▲ 0.16 (0.12%)
HUMNL 11.85 Decreased By ▼ -0.05 (-0.42%)
KEL 4.87 Increased By ▲ 0.03 (0.62%)
KOSM 4.56 Increased By ▲ 0.03 (0.66%)
MLCF 38.33 Increased By ▲ 0.06 (0.16%)
OGDC 135.02 Increased By ▲ 0.17 (0.13%)
PAEL 26.52 Increased By ▲ 0.17 (0.65%)
PIAA 19.24 Decreased By ▼ -1.56 (-7.5%)
PIBTL 6.82 Increased By ▲ 0.14 (2.1%)
PPL 122.84 Decreased By ▼ -0.16 (-0.13%)
PRL 27.59 Increased By ▲ 0.90 (3.37%)
PTC 14.20 Decreased By ▼ -0.13 (-0.91%)
SEARL 58.88 Decreased By ▼ -0.24 (-0.41%)
SNGP 68.80 Decreased By ▼ -0.70 (-1.01%)
SSGC 10.36 Increased By ▲ 0.03 (0.29%)
TELE 8.52 Increased By ▲ 0.02 (0.24%)
TPLP 11.21 Decreased By ▼ -0.02 (-0.18%)
TRG 64.88 Increased By ▲ 0.03 (0.05%)
UNITY 26.33 Increased By ▲ 0.08 (0.3%)
WTL 1.34 No Change ▼ 0.00 (0%)
BR100 7,862 Increased By 11.8 (0.15%)
BR30 25,348 Increased By 11.2 (0.04%)
KSE100 75,327 Increased By 120.1 (0.16%)
KSE30 24,172 Increased By 29 (0.12%)

South Korea would provide a loan of $78million for the construction of tunnel in Malakand Pass, an official of National highway Authority (NHA) told journalists on Wednesday. As per the feasibility study the proposed south portal of the Malakand Tunnel is located near Jabban Hydropower, whereas the north portal is located in Pirano Kalay before Batkhela.
He said that the PC-1 of the project based on preliminary design was approved by Executive Committee of the National Economic Council (ECNEC) in May 2011. However, the project could not materialize due to non-availability of funds. He said that loan agreement has been signed in December, 2012 between Economic Affairs Division and EXIM Bank of Korea for US $78million. To a question he said that increase in cost of the project will be determined after detailed designing of the project.
He said that the construction of Malakand tunnel would not only shorten distance for travellers belonging to Dir, Malakand, Swat and adjacent areas but also provide Pakistani goods an easy access to Central Asian states. The 9.7km project includes three bridges and approach roads on both sides of the tunnel. The Malakand tunnel project would also reduce pressure of traffic on Torkham Road because it would link Dir-Chitral with Tajikistan and other Central Asian Republics. A Korean Company, M/s Chunil, prepared the feasibility study of the 2.9 kilometre-long tunnel. Malakand Pass lies between Dargai-Batkhela and is situated at an altitude of 470 metres and 663 metres, respectively.
The feasibility conducted by South Korean firm M/s Chunil Engineering Consultants studied three alignments. The recommended alignment envisages Dargai as starting point of the tunnel and Batkhela as end point. It also envisages road tunnels of 3.172km, two-lane 8.663km road and three bridges of 152.5 metres on each carriageway.

Copyright Associated Press of Pakistan, 2015

Comments

Comments are closed.