AIRLINK 75.50 Increased By ▲ 1.80 (2.44%)
BOP 4.89 Decreased By ▼ -0.01 (-0.2%)
CNERGY 4.39 Decreased By ▼ -0.13 (-2.88%)
DFML 41.80 Decreased By ▼ -3.08 (-6.86%)
DGKC 83.12 Decreased By ▼ -2.38 (-2.78%)
FCCL 21.25 Decreased By ▼ -0.15 (-0.7%)
FFBL 32.22 Decreased By ▼ -0.29 (-0.89%)
FFL 9.38 Decreased By ▼ -0.21 (-2.19%)
GGL 10.04 Decreased By ▼ -0.23 (-2.24%)
HASCOL 6.92 Decreased By ▼ -0.21 (-2.95%)
HBL 113.60 Decreased By ▼ -1.10 (-0.96%)
HUBC 139.11 Increased By ▲ 0.01 (0.01%)
HUMNL 11.91 Decreased By ▼ -0.51 (-4.11%)
KEL 4.90 Decreased By ▼ -0.13 (-2.58%)
KOSM 4.34 Decreased By ▼ -0.11 (-2.47%)
MLCF 37.15 Decreased By ▼ -0.45 (-1.2%)
OGDC 132.90 Decreased By ▼ -3.90 (-2.85%)
PAEL 24.75 Decreased By ▼ -0.64 (-2.52%)
PIBTL 6.51 Decreased By ▼ -0.18 (-2.69%)
PPL 117.68 Decreased By ▼ -3.32 (-2.74%)
PRL 26.06 Decreased By ▼ -0.53 (-1.99%)
PTC 13.68 Decreased By ▼ -0.42 (-2.98%)
SEARL 56.90 Decreased By ▼ -0.40 (-0.7%)
SNGP 66.69 Decreased By ▼ -1.31 (-1.93%)
SSGC 10.25 Decreased By ▼ -0.17 (-1.63%)
TELE 8.23 Decreased By ▼ -0.22 (-2.6%)
TPLP 10.75 Decreased By ▼ -0.23 (-2.09%)
TRG 62.40 Decreased By ▼ -0.94 (-1.48%)
UNITY 27.05 No Change ▼ 0.00 (0%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 7,844 Decreased By -97.1 (-1.22%)
BR30 25,213 Decreased By -434.7 (-1.69%)
KSE100 74,793 Decreased By -724.1 (-0.96%)
KSE30 23,990 Decreased By -287.5 (-1.18%)

The World Bank has approved US $188 million to improve the reliability and safety of the Guddu Barrage and strengthen the Sindh Irrigation Department's capacity to operate and manage the barrages. Sindh Barrages Improvement Project (SBIP) under which the Guddu Barrage rehabilitation will be carried out is needed due to natural ageing of the infrastructure. The rehabilitation work will eliminate possible sources of failure and potentially give the structure another 50 years of life.
"Barrages are strategic assets of Sindh and millions of people depend on the water that is controlled, diverted, and managed by them. Their continued operation and management require specialized expertise, experience, decision making, and continuity of operation", says Rachid Benmessaoud, World Bank Country Director for Pakistan. "In addition to physical rehabilitation of barrage infrastructure, this project will also support the Sindh Government in training and technical assistance in procurement, financial, social and environmental safeguards for operating hydraulic irrigation infrastructure."
The SBIP will support the gate replacement works to improve the regulation and the flow of the barrage, the replacement of all 65 main barrage steel gates, 25 main canal head regulator gates, and hoist gears including all mechanical and electrical equipment. This project will also finance the independent Panel of Experts, who will review, monitor, evaluate, and help guide the rehabilitation process with regards to the safety of the barrage.
"The Guddu barrage constitutes the most strategic component of the large Indus Basin Irrigation System. The effective operation and structural stability are important for agricultural production and for averting potential disaster during floods. Climate variability will further add to risks by changing the frequency and intensity of extreme events such as floods and droughts", says Abdul Hamid Azad, the Task Team Leader of the Project. "Thus, 'no intervention' is not an option."-PR

Copyright Business Recorder, 2015

Comments

Comments are closed.