AIRLINK 72.50 Increased By ▲ 3.30 (4.77%)
BOP 5.01 Increased By ▲ 0.11 (2.24%)
CNERGY 4.31 Increased By ▲ 0.05 (1.17%)
DFML 31.91 Increased By ▲ 0.66 (2.11%)
DGKC 80.68 Increased By ▲ 3.43 (4.44%)
FCCL 20.97 Increased By ▲ 0.97 (4.85%)
FFBL 34.85 Decreased By ▼ -0.15 (-0.43%)
FFL 9.30 Increased By ▲ 0.18 (1.97%)
GGL 9.85 Increased By ▲ 0.05 (0.51%)
HBL 113.80 Increased By ▲ 1.04 (0.92%)
HUBC 134.20 Increased By ▲ 1.16 (0.87%)
HUMNL 7.02 Increased By ▲ 0.07 (1.01%)
KEL 4.32 Increased By ▲ 0.09 (2.13%)
KOSM 4.38 Increased By ▲ 0.13 (3.06%)
MLCF 37.28 Increased By ▲ 0.68 (1.86%)
OGDC 135.15 Increased By ▲ 2.28 (1.72%)
PAEL 23.79 Increased By ▲ 1.15 (5.08%)
PIAA 24.71 Increased By ▲ 0.51 (2.11%)
PIBTL 6.53 Increased By ▲ 0.07 (1.08%)
PPL 120.46 Increased By ▲ 4.16 (3.58%)
PRL 26.48 Increased By ▲ 0.58 (2.24%)
PTC 13.25 Increased By ▲ 0.17 (1.3%)
SEARL 52.77 Increased By ▲ 0.77 (1.48%)
SNGP 70.85 Increased By ▲ 3.25 (4.81%)
SSGC 10.55 Increased By ▲ 0.01 (0.09%)
TELE 8.40 Increased By ▲ 0.12 (1.45%)
TPLP 11.14 Increased By ▲ 0.34 (3.15%)
TRG 60.95 Increased By ▲ 1.66 (2.8%)
UNITY 25.27 Increased By ▲ 0.14 (0.56%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,487 Increased By 78.3 (1.06%)
BR30 24,523 Increased By 486.9 (2.03%)
KSE100 71,478 Increased By 810.7 (1.15%)
KSE30 23,436 Increased By 211.9 (0.91%)

ISLAMABAD: The World Bank (WB) has rated the overall implementation progress of the “Pakistan Crisis-Resilient Social Protection”, of around $600 million as satisfactory.

The Crisis Resilient Social Protection program became effective on March 29, 2021. It is a 4-year, $600 million program for results operation, which includes a $5 million Technical Assistance component.

The project closing date is 30 June 2025 where 99 percent disbursement have so far been made.

The program has three result areas focusing on; a) Building a crisis-resilient delivery system; b) Establishing a Hybrid Social Protection (SP) system for resilience of poor against future crisis; c) Protecting human capital through demand-side education and health initiatives for children.

The project was designed to respond to gaps identified by the government during the Covid emergency cash transfer response through the Benazir Income Support Program (BISP). The institutional and operational reforms proposed under the program were designed to further improve the delivery system, expand coverage to protect human capital investments and introduce mechanisms to mitigate the risks for the vulnerable population not covered by the regular BISP safety net programs

The recent Implementation Support Mission (ISM) noted continued good progress towards achievement of most results, as elaborated in the results section below. However, delays remain in the launch of the Hybrid Social Protection scheme, and a beneficiary-centric design of the new payment system.

Copyright Business Recorder, 2024

Comments

Comments are closed.