AIRLINK 73.18 Increased By ▲ 0.38 (0.52%)
BOP 5.00 Decreased By ▼ -0.06 (-1.19%)
CNERGY 4.37 Increased By ▲ 0.04 (0.92%)
DFML 29.95 Decreased By ▼ -0.57 (-1.87%)
DGKC 91.39 Increased By ▲ 5.44 (6.33%)
FCCL 23.15 Increased By ▲ 0.80 (3.58%)
FFBL 33.50 Increased By ▲ 0.28 (0.84%)
FFL 9.92 Increased By ▲ 0.14 (1.43%)
GGL 10.35 Decreased By ▼ -0.05 (-0.48%)
HBL 113.01 Decreased By ▼ -0.61 (-0.54%)
HUBC 136.28 Increased By ▲ 0.08 (0.06%)
HUMNL 9.60 Decreased By ▼ -0.43 (-4.29%)
KEL 4.78 Increased By ▲ 0.12 (2.58%)
KOSM 4.72 Increased By ▲ 0.32 (7.27%)
MLCF 39.89 Increased By ▲ 1.54 (4.02%)
OGDC 133.90 Increased By ▲ 0.50 (0.37%)
PAEL 28.85 Increased By ▲ 1.45 (5.29%)
PIAA 25.00 Increased By ▲ 0.24 (0.97%)
PIBTL 6.94 Increased By ▲ 0.39 (5.95%)
PPL 122.40 Increased By ▲ 1.19 (0.98%)
PRL 27.40 Increased By ▲ 0.25 (0.92%)
PTC 14.80 Increased By ▲ 0.91 (6.55%)
SEARL 60.40 No Change ▼ 0.00 (0%)
SNGP 70.29 Increased By ▲ 1.76 (2.57%)
SSGC 10.42 Increased By ▲ 0.09 (0.87%)
TELE 8.85 Decreased By ▼ -0.20 (-2.21%)
TPLP 11.32 Increased By ▲ 0.06 (0.53%)
TRG 66.57 Increased By ▲ 0.87 (1.32%)
UNITY 25.20 Decreased By ▼ -0.05 (-0.2%)
WTL 1.55 Increased By ▲ 0.05 (3.33%)
BR100 7,676 Increased By 42.9 (0.56%)
BR30 25,471 Increased By 298.6 (1.19%)
KSE100 73,086 Increased By 427.5 (0.59%)
KSE30 23,427 Increased By 44.5 (0.19%)

ISLAMABAD: This is with reference to a news captioned “Rs67bn loss caused thru misuse of subsidized RLNG for EoUs” published in Business Recorder on 23rd May 2023.

In this context, it is submitted that there was no restriction regarding installation of co-generation facility for Captive Power Units, prior to the CCoE decision dated 21.02.2021.

Rs67bn loss caused thru misuse of subsidised RLNG for EoUs

In compliance to the CCoE decision dated 21.01.2021, cogeneration facility was made compulsory for Captive Power Units by SNGPL, subject to some exemptions for a certain period of time, ie, till such units are provided sufficient load for electricity by the respective DISCOs.

Therefore, it is clarified that during October 2018 to January 2021, there was no condition/embargo on SNGPL regarding supply of gas/RLNG (including concessionary tariff) to only those CPPs where co-generation facility was installed. Copy of the letter is attached for ready reference.

Moreover, it is the FBR/Ministry of Commerce which establishes that an industrial unit availing utilities under specific consumer number falls and qualifies as exporter for the GoP subsidy. SNGPL merely acts accordingly.

It is further submitted that the instructions/recommendations of the FBR, Ministry of Finance and Ministry of Commerce w.r.t. categorization of any unit as export industry and applicability of subsidized tariff, conveyed through Petroleum Division are complied with by SNGPL.

As regards the statement in above news, ie, “SNGPL claimed the subsidy of Rs.105 billion from October, 2018 to June 2022,” is concerned, the same is correct. Moreover, we understand that concerned ministries/quarters proceed the SNGPL subsidy claims after fulfilling the all necessary formalities and procedures.

Therefore, the statement that “but no validation of SNGPL’s claim was done and compliance instructions (SOP) of Finance/Petroleum Division was not ensured by DG Gas,” is not correct. Story was based on special audit report.

Copyright Business Recorder, 2023

Comments

Comments are closed.