BR100 Increased By (1.02%)
BR30 Increased By (1.71%)
KSE100 Increased By (0.58%)
KSE30 Increased By (0.65%)
BECO 6.03 Increased By ▲ 0.26 (4.51%)
BML 52.61 Decreased By ▼ -0.39 (-0.74%)
BOP 34.23 Increased By ▲ 0.24 (0.71%)
CNERGY 8.16 Increased By ▲ 0.05 (0.62%)
DCL 12.23 Increased By ▲ 0.03 (0.25%)
FCCL 53.80 Increased By ▲ 0.97 (1.84%)
FCSC 5.24 Increased By ▲ 0.17 (3.35%)
FFL 18.03 Increased By ▲ 0.08 (0.45%)
FNEL 1.30 Increased By ▲ 0.01 (0.78%)
HUMNL 11.00 Increased By ▲ 0.12 (1.1%)
KEL 8.07 Increased By ▲ 0.05 (0.62%)
KOSM 5.39 Decreased By ▼ -0.13 (-2.36%)
MLCF 87.90 Increased By ▲ 1.39 (1.61%)
NBP 186.60 Increased By ▲ 1.44 (0.78%)
PACE 10.75 Increased By ▲ 0.17 (1.61%)
PAEL 39.95 Increased By ▲ 0.53 (1.34%)
PIAHCLA 26.19 Decreased By ▼ -0.03 (-0.11%)
PIBTL 17.32 Increased By ▲ 0.65 (3.9%)
PPL 233.49 Increased By ▲ 5.31 (2.33%)
PRL 34.98 Increased By ▲ 0.30 (0.87%)
PTC 67.71 Increased By ▲ 2.38 (3.64%)
SEARL 90.90 Increased By ▲ 0.77 (0.85%)
SSGC 27.20 Increased By ▲ 0.60 (2.26%)
TELE 8.57 Increased By ▲ 0.29 (3.5%)
THCCL 60.85 Increased By ▲ 2.35 (4.02%)
TPLP 8.78 Increased By ▲ 0.56 (6.81%)
TREET 24.65 Increased By ▲ 0.12 (0.49%)
TRG 71.50 Increased By ▲ 1.79 (2.57%)
WAVES 10.01 Increased By ▲ 0.07 (0.7%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)
By

BEIJING: China has officially delivered two Hualong-1 nuclear power units, which were developed with China’s homegrown third-generation nuclear power technology, to Pakistan, according to the China National Nuclear Corporation (CNNC).

With the inauguration of Unit 3 of the Karachi Nuclear Power Plant (K-3) on Thursday, the two million-kilowatt Hualong-1 units K-2 and K-3 have now both officially been delivered to Pakistan and put into operation, said the CNNC.

1,100MW K-3 inaugurated, China praised

The CNNC said it has built two nuclear power stations in Pakistan with a total of six nuclear power units. Among them, the Karachi K-2/K-3 nuclear power plant is the largest nuclear power plant in Pakistan and the first million-kilowatt-grade single-unit power project in the country, CGTN reported on Sunday.

Since entering commercial operation, the K-2 and K-3 units have generated nearly 20 billion kilowatt-hours of electricity, contributing to Pakistan’s social and economic development, it said.

At the same time, the project has provided more than 60,000 jobs for the local people throughout the whole cycle, said the CNNC.

Comments

Comments are closed for this article.

Mian. Saif ur Rehman Feb 08, 2023 04:55am
Good news for Pakistan. We need electricity and nuclear power generation can help us to overcome our energy needs. Pakistan has uranium resources for this purpose.
0