BR100 Increased By (0.11%)
BR30 Decreased By (-0.26%)
KSE100 Increased By (0.12%)
KSE30 Increased By (0.09%)
AGHA 7.79 Increased By ▲ 0.04 (0.52%)
BECO 5.23 Increased By ▲ 0.04 (0.77%)
BML 57.26 Decreased By ▼ -1.40 (-2.39%)
BOP 34.10 Increased By ▲ 0.41 (1.22%)
CNERGY 9.92 Decreased By ▼ -0.69 (-6.5%)
CSIL 5.35 Increased By ▲ 0.05 (0.94%)
FCCL 54.61 Increased By ▲ 0.87 (1.62%)
FFL 16.70 Increased By ▲ 0.24 (1.46%)
FNEL 1.24 Increased By ▲ 0.02 (1.64%)
KEL 7.42 Increased By ▲ 0.14 (1.92%)
KOSM 5.75 Increased By ▲ 0.11 (1.95%)
LOTCHEM 29.35 Decreased By ▼ -0.30 (-1.01%)
MLCF 94.35 Decreased By ▼ -2.01 (-2.09%)
NBP 202.70 Decreased By ▼ -0.83 (-0.41%)
NCPL 57.00 Increased By ▲ 0.15 (0.26%)
NPL 67.78 Increased By ▲ 0.47 (0.7%)
OGDC 316.40 Decreased By ▼ -1.82 (-0.57%)
PACE 10.64 Increased By ▲ 0.01 (0.09%)
PAEL 43.15 Increased By ▲ 1.38 (3.3%)
PIBTL 16.72 Decreased By ▼ -0.09 (-0.54%)
PPL 220.50 Increased By ▲ 0.33 (0.15%)
PRL 49.05 No Change ▼ 0.00 (0%)
PTC 70.98 Increased By ▲ 0.97 (1.39%)
SSGC 28.17 Decreased By ▼ -0.97 (-3.33%)
TBL 9.90 Increased By ▲ 0.13 (1.33%)
TELE 8.80 Decreased By ▼ -0.02 (-0.23%)
TPL 18.14 Increased By ▲ 0.97 (5.65%)
TPLP 13.40 Increased By ▲ 0.89 (7.11%)
TREET 22.75 Increased By ▲ 0.16 (0.71%)
TRG 60.30 Increased By ▲ 0.08 (0.13%)
By

BEIJING: China has officially delivered two Hualong-1 nuclear power units, which were developed with China’s homegrown third-generation nuclear power technology, to Pakistan, according to the China National Nuclear Corporation (CNNC).

With the inauguration of Unit 3 of the Karachi Nuclear Power Plant (K-3) on Thursday, the two million-kilowatt Hualong-1 units K-2 and K-3 have now both officially been delivered to Pakistan and put into operation, said the CNNC.

1,100MW K-3 inaugurated, China praised

The CNNC said it has built two nuclear power stations in Pakistan with a total of six nuclear power units. Among them, the Karachi K-2/K-3 nuclear power plant is the largest nuclear power plant in Pakistan and the first million-kilowatt-grade single-unit power project in the country, CGTN reported on Sunday.

Since entering commercial operation, the K-2 and K-3 units have generated nearly 20 billion kilowatt-hours of electricity, contributing to Pakistan’s social and economic development, it said.

At the same time, the project has provided more than 60,000 jobs for the local people throughout the whole cycle, said the CNNC.

Comments

Comments are closed for this article.

Mian. Saif ur Rehman Feb 08, 2023 04:55am
Good news for Pakistan. We need electricity and nuclear power generation can help us to overcome our energy needs. Pakistan has uranium resources for this purpose.
0