AIRLINK 78.39 Increased By ▲ 5.39 (7.38%)
BOP 5.34 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.33 Increased By ▲ 0.02 (0.46%)
DFML 30.87 Increased By ▲ 2.32 (8.13%)
DGKC 78.51 Increased By ▲ 4.22 (5.68%)
FCCL 20.58 Increased By ▲ 0.23 (1.13%)
FFBL 32.30 Increased By ▲ 1.40 (4.53%)
FFL 10.22 Increased By ▲ 0.16 (1.59%)
GGL 10.29 Decreased By ▼ -0.10 (-0.96%)
HBL 118.50 Increased By ▲ 2.53 (2.18%)
HUBC 135.10 Increased By ▲ 2.90 (2.19%)
HUMNL 6.87 Increased By ▲ 0.19 (2.84%)
KEL 4.17 Increased By ▲ 0.14 (3.47%)
KOSM 4.73 Increased By ▲ 0.13 (2.83%)
MLCF 38.67 Increased By ▲ 0.13 (0.34%)
OGDC 134.85 Increased By ▲ 1.00 (0.75%)
PAEL 23.40 Decreased By ▼ -0.43 (-1.8%)
PIAA 26.64 Decreased By ▼ -0.49 (-1.81%)
PIBTL 7.02 Increased By ▲ 0.26 (3.85%)
PPL 113.45 Increased By ▲ 0.65 (0.58%)
PRL 27.73 Decreased By ▼ -0.43 (-1.53%)
PTC 14.60 Decreased By ▼ -0.29 (-1.95%)
SEARL 56.50 Increased By ▲ 0.08 (0.14%)
SNGP 66.30 Increased By ▲ 0.50 (0.76%)
SSGC 10.94 Decreased By ▼ -0.07 (-0.64%)
TELE 9.15 Increased By ▲ 0.13 (1.44%)
TPLP 11.67 Decreased By ▼ -0.23 (-1.93%)
TRG 71.43 Increased By ▲ 2.33 (3.37%)
UNITY 24.51 Increased By ▲ 0.80 (3.37%)
WTL 1.33 No Change ▼ 0.00 (0%)
BR100 7,493 Increased By 58.6 (0.79%)
BR30 24,558 Increased By 338.4 (1.4%)
KSE100 72,052 Increased By 692.5 (0.97%)
KSE30 23,808 Increased By 241 (1.02%)

ISLAMABAD: Pakistan Muslim League-Nawaz (PML-N) senior leader Senator Musaddiq Malik has blamed Imran Khan’s government for the current load shedding in the country. In a statement, Malik said that in 2013, there was load shedding everywhere in Pakistan from 12-14 hours in urban areas of Pakistan and 14-16 and 18 hours in rural areas.

However, Mian Nawaz Sharif worked tirelessly and his government added 12,000 MW of additional power to the national grid and his hard work ended load shedding in the country. Nawaz Sharif’s hard work increased Pakistan’s power generation capacity to 35,000 MW, he pointed out.

He said that it was unfortunate that in 2022, the same additional 12000 MW of power would be cut off which was produced with great effort during the PML-N era. He said today more than 5,000 MW of this electricity is unavailable because the Imran government did not buy oil and gas. An additional 4,000 MW is not available due to non-repair of power plants, he added. He went on to say that had Imran government arranged timely fuel and repairs, the people would not have suffered from load shedding.

“2000 MW load shedding was regular schedule for maintenance; this is the period during which power plants are repaired every year. During PML-N tenure 2013-2018, repairs and overhauling were done in winter and spring when people need less electricity. But Imran Khan’s failed government repaired power plants in the summer, he said adding this showed his intellect and managerial ability. The additional 12000 MW power generated during Nawaz Sharif era was not coming to the national grid due to incompetence, cheapness and criminal negligence of Imran government.

Copyright Business Recorder, 2022

Comments

Comments are closed.