AIRLINK 72.65 Increased By ▲ 3.45 (4.99%)
BOP 5.05 Increased By ▲ 0.15 (3.06%)
CNERGY 4.29 Increased By ▲ 0.03 (0.7%)
DFML 31.75 Increased By ▲ 0.50 (1.6%)
DGKC 79.55 Increased By ▲ 2.30 (2.98%)
FCCL 20.71 Increased By ▲ 0.71 (3.55%)
FFBL 34.75 Decreased By ▼ -0.25 (-0.71%)
FFL 9.29 Increased By ▲ 0.17 (1.86%)
GGL 9.86 Increased By ▲ 0.06 (0.61%)
HBL 113.51 Increased By ▲ 0.75 (0.67%)
HUBC 133.47 Increased By ▲ 0.43 (0.32%)
HUMNL 7.05 Increased By ▲ 0.10 (1.44%)
KEL 4.27 Increased By ▲ 0.04 (0.95%)
KOSM 4.35 Increased By ▲ 0.10 (2.35%)
MLCF 36.95 Increased By ▲ 0.35 (0.96%)
OGDC 134.15 Increased By ▲ 1.28 (0.96%)
PAEL 23.69 Increased By ▲ 1.05 (4.64%)
PIAA 24.74 Increased By ▲ 0.54 (2.23%)
PIBTL 6.48 Increased By ▲ 0.02 (0.31%)
PPL 118.30 Increased By ▲ 2.00 (1.72%)
PRL 26.20 Increased By ▲ 0.30 (1.16%)
PTC 13.18 Increased By ▲ 0.10 (0.76%)
SEARL 52.50 Increased By ▲ 0.50 (0.96%)
SNGP 69.00 Increased By ▲ 1.40 (2.07%)
SSGC 10.48 Decreased By ▼ -0.06 (-0.57%)
TELE 8.31 Increased By ▲ 0.03 (0.36%)
TPLP 11.16 Increased By ▲ 0.36 (3.33%)
TRG 58.70 Decreased By ▼ -0.59 (-1%)
UNITY 25.26 Increased By ▲ 0.13 (0.52%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)
BR100 7,448 Increased By 39 (0.53%)
BR30 24,302 Increased By 265.2 (1.1%)
KSE100 71,169 Increased By 501.7 (0.71%)
KSE30 23,327 Increased By 103 (0.44%)

LAHORE: National Transmission and Despatch Company (NTDC) has successfully completed and energized the 133 km long 2nd phase of 500 kV Neelum-Jhehlum double circuit transmission line and energised it successfully.

Now the power generated through 969 MW Neelum-Jhehlum Hydropower Project will be dispatched directly to 500 kV Nokhar (New Ghakkar) Grid Station which is closer to the load centres.

The spokesman has said that the transmission line has been completed in two phases. Phase-I is comprised of 152 km long emanating from Neelum-Jhelum Power House to Domeli (near Rawat) which was completed in 2018, hence, completed 285 km of both phases. The 969 MW power from Neelum Jhelum HPP was being evacuated from it through 500 kV Rawat Grid Station.

The spokesman further updated that in addition to power evacuation from Neelum-Jhelum Hydropower Project, NTDC has also connected 720 MW Karot HPP through looping with this Neelum-Jhelum to Nokhar Transmission Line. Presently, the testing of 720 MW Karot Hydropower Project is underway and after its successful commissioning, 720 MW cheap energy will be added soon in the National Grid.

Resultantly, load management issues of Gujranwala, Sialkot and the surrounding districts will be overcome. Moreover, the addition of hydel power will play a key role in improving the system reliability and voltage profile at load centers.

Copyright Business Recorder, 2022

Comments

Comments are closed.